Constructions near Fort Worth, Texas
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPW Exchange Ave is closed from Ellis Ave to N Main St / E Exchange Ave.
W Exchange Ave is closed from Ellis Ave to N Main St / E Exchange Ave.
Start Time: 2024-06-04T03:12:03.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPW Exchange Ave is closed from N Main St / E Exchange Ave to Ellis Ave.
W Exchange Ave is closed from N Main St / E Exchange Ave to Ellis Ave.
Start Time: 2024-06-04T03:12:03.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPNighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Nighttime closure only. Travel lanes reduced to one lane. Southbound US 287 reduced to one lane between Little Road and Sublett Road.
Start Time: 2024-06-04T02:00:00.000-05:00
End Time: 2024-06-04T11:00:00.000-05:00
map local traffic - MAPSW Loop 820 is closed at Fort Worth.
SW Loop 820 is closed at Fort Worth.
Start Time: 2024-06-04T00:53:37.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPMontgomery St is closed from Chisholm Trail Pkwy to I-30 E.
Montgomery St is closed from Chisholm Trail Pkwy to I-30 E.
Start Time: 2024-06-04T00:19:08.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPMontgomery St is closed from I-30/West Fwy to W Vickery Blvd.
Montgomery St is closed from I-30/West Fwy to W Vickery Blvd.
Start Time: 2024-06-04T00:19:08.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPBridge St is closed from Woodhaven Blvd to Bridgewood Dr.
Bridge St is closed from Woodhaven Blvd to Bridgewood Dr.
Start Time: 2024-06-03T15:45:46.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPLane closure scheduled 04/06/2024 - 07/06/2024
Lane closure scheduled 04/06/2024 - 07/06/2024
Start Time: 2024-06-03T02:00:00.000-05:00
End Time: 2024-06-07T11:00:00.000-05:00
map local traffic - MAPRoadwork from exit [442A] to Mansfield Hwy.
Roadwork from exit [442A] to Mansfield Hwy.
Start Time: 2024-05-30T10:40:00.000-05:00
End Time: 2024-06-04T07:54:41.693-05:00
map local traffic - MAPMain lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
Main lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
Start Time: 2024-05-24T02:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPLeft lane closed. IH 820 NB from Trinity Blvd to SH 10. 820 NB left lane closed to pin F-shape barrier. Closure is being extended due to weather.
Left lane closed. IH 820 NB from Trinity Blvd to SH 10. 820 NB left lane closed to pin F-shape barrier. Closure is being extended due to weather.
Start Time: 2024-05-18T02:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPMills St is closed from W Bluff St to W Peach St.
Mills St is closed from W Bluff St to W Peach St.
Start Time: 2024-06-03T08:02:28.000-05:00
End Time: 2024-06-05T23:59:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-06-03T02:00:00.000-05:00
End Time: 2024-06-06T22:00:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-06-03T02:00:00.000-05:00
End Time: 2024-06-06T22:00:00.000-05:00
map local traffic - MAPGrayson Way is closed from Emma Way to Bursey Rd.
Grayson Way is closed from Emma Way to Bursey Rd.
Start Time: 2024-05-31T00:00:00.000-05:00
End Time: 2024-06-07T23:59:59.000-05:00
map local traffic - MAPRoadwork from Kingham Way / Royal Crest Dr to Thompson St / E Bell St.
Roadwork from Kingham Way / Royal Crest Dr to Thompson St / E Bell St.
Start Time: 2024-05-30T12:55:29.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPRoadwork from Thompson St / E Bell St to Kingham Way / Royal Crest Dr.
Roadwork from Thompson St / E Bell St to Kingham Way / Royal Crest Dr.
Start Time: 2024-05-30T12:55:29.000-05:00
End Time: 2024-06-06T23:59:00.000-05:00
map local traffic - MAPHanon Dr is closed from Crandle Dr to Sandell Dr.
Hanon Dr is closed from Crandle Dr to Sandell Dr.
Start Time: 2024-05-29T13:35:04.000-05:00
End Time: 2024-06-05T23:59:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Start Time: 2024-06-03T14:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Start Time: 2024-06-03T14:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Start Time: 2024-06-03T14:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic - MAPRoadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Roadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
Start Time: 2024-05-27T16:08:00.000-05:00
End Time: 2024-06-04T07:54:41.693-05:00
map local traffic - MAPRoadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Roadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
Start Time: 2024-05-23T03:26:30.000-05:00
End Time: 2024-06-04T07:54:41.693-05:00
map local traffic - MAPDelays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (FM 156) NB/SB from 287 to Watauga Rd (McElroy): Traffic control to install permanent marking, block sodding, ramps, sidewalk, and work on punch list items.
Start Time: 2024-05-21T03:41:30.000-05:00
End Time: 2024-07-10T23:55:00.000-05:00
map local traffic - MAPRoadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Roadwork on W Interstate 20 from Bowman Springs Rd (I-20 Frontage) to US-287/SE Loop 820/Gateway Dr (I-20 Frontage).
Start Time: 2024-05-20T06:52:30.000-05:00
End Time: 2024-06-04T07:54:41.693-05:00
map local traffic - MAPRoadworks scheduled 04/06/2024 - 03/08/2024
Roadworks scheduled 04/06/2024 - 03/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-02T20:00:12.000-05:00
map local traffic - MAPRoadworks scheduled 04/06/2024 - 03/08/2024
Roadworks scheduled 04/06/2024 - 03/08/2024
Start Time: 2024-04-04T11:00:20.000-05:00
End Time: 2024-08-02T20:00:12.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-06-03T02:00:00.000-05:00
End Time: 2024-06-06T22:00:00.000-05:00
map local traffic - MAPLanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. SH 183 WB (NE 28th St) from N Nichols St to Decatur Ave. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation for the duration of 06/02, 06/03, 06/04, 06/05, 06/06. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
Start Time: 2024-06-03T02:00:00.000-05:00
End Time: 2024-06-06T22:00:00.000-05:00
map local traffic - MAPRight lane closed. SH 121 EB from Handley Ederville to SH 10. 121 EB Right lane closed for milling trucks to enter onto the highway safely. Closure is being extended due to weather.
Right lane closed. SH 121 EB from Handley Ederville to SH 10. 121 EB Right lane closed for milling trucks to enter onto the highway safely. Closure is being extended due to weather.
Start Time: 2024-05-29T02:00:00.000-05:00
End Time: 2024-06-08T20:00:00.000-05:00
map local traffic