Constructions near I 81 NY exit 1
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPNYSDOT - Region 9: Roadwork on NY 17 [Delaware] both directions between Exit 84 - NY 17 (Exit 84) connector to NY 8/NY 10 (Deposit) and Exit 89 - Old State Highway; Ramp (Hancock) 1 left lane of 2 lanes blocked for guiderail repair to occur from 4/29 through 5/3 during the hours of 7:00 AM to 1:00 PM. This work is weather dependent with no flagger personnel present. Started open Reach. IR# 5143091
NYSDOT - Region 9: Roadwork on NY 17 [Delaware] both directions between Exit 84 - NY 17 (Exit 84) connector to NY 8/NY 10 (Deposit) and Exit 89 - Old State Highway; Ramp (Hancock) 1 left lane of 2 lanes blocked for guiderail repair to occur from 4/29 through 5/3 during the hours of 7:00 AM to 1:00 PM. This work is weather dependent with no flagger personnel present. Started open Reach. IR# 5143091
Start Time: 2024-04-29T09:22:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPRoadwork on PA-858 / Pennsylvania Ave from Bow Bridge Rd to Park Ln.
Roadwork on PA-858 / Pennsylvania Ave from Bow Bridge Rd to Park Ln.
Start Time: 2024-05-03T14:50:30.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPRoadwork on PA-858 / Pennsylvania Ave from Park Ln to Bow Bridge Rd.
Roadwork on PA-858 / Pennsylvania Ave from Park Ln to Bow Bridge Rd.
Start Time: 2024-05-03T14:50:30.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPRoadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Roadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Start Time: 2024-04-16T03:23:30.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPRoadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Roadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Start Time: 2024-03-19T10:20:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-05-29T09:00:05.055-04:00
map local traffic