NYSDOT Region 9: Roadwork On NY 7 Both Directions Between Fallbrook Road (Conklin) And Millburn Drive (Conklin) 1 Alternate Lanes Of 2 Lanes Blocked For Bridge Approach Slab Reconstruction And Overlay From 4/15 Through 5/24 During The Hours Of 6:30 AM To 3:00 PM. This Work Is Weather Dependent With No Flagger Personnel Present. All Traffic Through Site Controlled Via Temporary Signal. Started Open Reach. IR# 5051091 D264467 Traffic
2024-05-29
Roadnow