Constructions near I 89 exit 16
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPTRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025.
TRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025.
Start Time: 2023-08-10T06:00:00.000-04:00
End Time: 2026-06-26T17:00:00.000-04:00
map local traffic - MAPTRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025.
TRAFFIC ALERT: US-4 In Hartford (Quechee Gorge Bridge) alternating one-way traffic for bridge repair controlled with a temporary signal. Construction hours Monday-Friday 6AM-6PM. Pedestrian access under bridge is closed until November 2025.
Start Time: 2023-08-10T06:00:00.000-04:00
End Time: 2026-06-26T17:00:00.000-04:00
map local traffic - MAPLong Term Construction Project: Newport, NH-10/ 11 and NH-103, Pavement resurfacing and ADA improvements. #43060B
Long Term Construction Project: Newport, NH-10/ 11 and NH-103, Pavement resurfacing and ADA improvements. #43060B
Start Time: 2024-04-19T09:32:10.000-04:00
End Time: 2024-05-13T07:13:05.552-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
TRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
Start Time: 2024-05-13T00:00:00.000-04:00
End Time: 2024-05-17T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
TRAFFIC ALERT: Bridge maintenance on I-91 NB & SB Approximately 1.1 miles north of Exit 12 in Wilder. Removal of the existing bridge pavement, concrete repairs to the deck, installing membrane and re-paving the deck with associated approach work. Both I-91 North and Southbound will be reduced to one-lane for the duration of the project. Flaggers will be used as needed to reduce US-5 under the bridge to one-lane during working hours only.
Start Time: 2024-05-13T00:00:00.000-04:00
End Time: 2024-05-17T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: I-89 SB in Hartford approximately 3 miles north of Exit 1. Bridge maintenance: joint repair and associated approach work. The roadway will be reduced to one-lane for the duration of the project. 14'4" width restriction.
TRAFFIC ALERT: I-89 SB in Hartford approximately 3 miles north of Exit 1. Bridge maintenance: joint repair and associated approach work. The roadway will be reduced to one-lane for the duration of the project. 14'4" width restriction.
Start Time: 2024-05-13T00:00:00.000-04:00
End Time: 2024-05-17T23:59:59.000-04:00
map local traffic - MAPConstruction in Hartford along US-5 from MM 0.0 (Town Line) to MM 4.75 (Near the NH line) Work to be performed will be various road rebuilding activities (demolition, paving, drainage, traffic signals, and rail work). Flagging and lane closures during all hours of the day.
Construction in Hartford along US-5 from MM 0.0 (Town Line) to MM 4.75 (Near the NH line) Work to be performed will be various road rebuilding activities (demolition, paving, drainage, traffic signals, and rail work). Flagging and lane closures during all hours of the day.
Start Time: 2024-04-18T17:54:18.000-04:00
End Time: 2024-11-01T17:58:00.000-04:00
map local traffic - MAPTRAFFIC ALERT: Lyme-East Thetford Bridge crossing the Connecticut River from VT-113 is CLOSED to all traffic for rehabilitation. Two signed detours will be in place.
TRAFFIC ALERT: Lyme-East Thetford Bridge crossing the Connecticut River from VT-113 is CLOSED to all traffic for rehabilitation. Two signed detours will be in place.
Start Time: 2023-04-27T05:00:00.000-04:00
End Time: 2024-11-01T06:00:00.000-04:00
map local traffic - MAPTRAFFIC ALERT: Lyme-East Thetford Bridge crossing the Connecticut River from VT-113 is CLOSED to all traffic for rehabilitation. Two signed detours will be in place.
TRAFFIC ALERT: Lyme-East Thetford Bridge crossing the Connecticut River from VT-113 is CLOSED to all traffic for rehabilitation. Two signed detours will be in place.
Start Time: 2023-04-27T05:00:00.000-04:00
End Time: 2024-11-01T06:00:00.000-04:00
map local traffic