Current Constructions
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 NB in Richmond approx. 2-miles south of Exit 11, left lane closure for the bridge replacement project on US-2. Monday-Friday 6:00 AM until 3:00 PM. Currently 14-foot lane width maximum.
    I-89 NB in Richmond approx. 2-miles south of Exit 11, left lane closure for the bridge replacement project on US-2. Monday-Friday 6:00 AM until 3:00 PM. Currently 14-foot lane width maximum.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2025-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2024-06-08T23:59:59.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Vt Route 108 S from Morse Dr to Mountain Rd.
    Roadwork on VT-108 / Vt Route 108 S from Morse Dr to Mountain Rd.
    Start Time: 2024-05-15T07:45:45.000-04:00
    End Time: 2024-06-04T08:59:32.883-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Mountain Rd from Mansfield Base to VT Route 108 S.
    Roadwork on VT-108 / Mountain Rd from Mansfield Base to VT Route 108 S.
    Start Time: 2024-05-14T19:44:30.000-04:00
    End Time: 2024-06-04T08:59:32.883-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Start Time: 2024-05-14T17:44:06.000-04:00
    End Time: 2024-06-04T08:59:32.883-04:00