know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along AR-roads

Constructions near Junction at Petro Road

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Roadwork on I-55 S from US-61 (I-55) to S Pkwy (I-55).
    Roadwork on I-55 S from US-61 (I-55) to S Pkwy (I-55).
    Start Time: 2024-06-11T21:14:00.000-05:00
    End Time: 2024-06-12T07:23:14.352-05:00
    maplocal traffic
  • MAP
    Roadwork on I-55 N / US-61 N / US-70 W / US-79 S from Bridgeport Cv/Exit 1 (I-55) to Mound City Rd/Exit 3A (I-55).
    Roadwork on I-55 N / US-61 N / US-70 W / US-79 S from Bridgeport Cv/Exit 1 (I-55) to Mound City Rd/Exit 3A (I-55).
    Start Time: 2024-06-11T21:09:00.000-05:00
    End Time: 2024-06-12T07:23:14.352-05:00
    maplocal traffic
  • MAP
    Roadwork on I-55 S / US-61 S / US-79 N / US-70 E from Mound City Rd/Exit 3A (I-55) to Bridgeport Cv/Exit 1 (I-55).
    Roadwork on I-55 S / US-61 S / US-79 N / US-70 E from Mound City Rd/Exit 3A (I-55) to Bridgeport Cv/Exit 1 (I-55).
    Start Time: 2024-06-11T19:09:00.000-05:00
    End Time: 2024-06-12T07:23:14.352-05:00
    maplocal traffic
  • MAP
    I-55 N / US-79 S / US-70 W / US-61 N is closed from Metal Museum Dr (I-55) to Bridgeport Cv/Exit 1 (I-55).
    I-55 N / US-79 S / US-70 W / US-61 N is closed from Metal Museum Dr (I-55) to Bridgeport Cv/Exit 1 (I-55).
    Start Time: 2024-06-09T00:00:00.000-05:00
    End Time: 2024-06-23T23:59:59.000-05:00
    maplocal traffic
  • MAP
    I-55 S / US-61 S / US-70 E / US-79 N is closed from Bridgeport Cv/Exit 1 (I-55) to Metal Museum Dr (I-55).
    I-55 S / US-61 S / US-70 E / US-79 N is closed from Bridgeport Cv/Exit 1 (I-55) to Metal Museum Dr (I-55).
    Start Time: 2024-06-09T00:00:00.000-05:00
    End Time: 2024-06-23T23:59:59.000-05:00
    maplocal traffic
  • MAP
    I-55 S / US-61 S / US-79 N / US-70 E is closed from Mound City Rd/Exit 3A (I-55) to Metal Museum Dr (I-55).
    I-55 S / US-61 S / US-79 N / US-70 E is closed from Mound City Rd/Exit 3A (I-55) to Metal Museum Dr (I-55).
    Start Time: 2024-06-09T00:00:00.000-05:00
    End Time: 2024-06-23T23:59:59.000-05:00
    maplocal traffic
  • MAP
    I-55 N is closed from S Pkwy (I-55) to Bridgeport Cv/Exit 1 (I-55).
    I-55 N is closed from S Pkwy (I-55) to Bridgeport Cv/Exit 1 (I-55).
    Start Time: 2024-06-09T00:00:00.000-05:00
    End Time: 2024-06-23T23:59:59.000-05:00
    maplocal traffic
  • MAP
    Interstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
    Interstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
    Start Time: 2022-05-03T00:36:00.000-05:00
    End Time: 2025-02-25T00:00:00.000-06:00
    maplocal traffic
  • MAP
    Blythe St is closed from Nelson Ave to S Cooper St / Young Ave.
    Blythe St is closed from Nelson Ave to S Cooper St / Young Ave.
    Start Time: 2024-06-11T04:52:58.000-05:00
    End Time: 2024-06-13T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on Overton Crossing St from Frayser Blvd to Jan Dr.
    Roadwork on Overton Crossing St from Frayser Blvd to Jan Dr.
    Start Time: 2024-05-31T18:35:01.000-05:00
    End Time: 2024-06-12T07:23:14.352-05:00
    maplocal traffic
  • MAP
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    Start Time: 2024-04-08T11:41:00.000-05:00
    End Time: 2024-09-30T00:00:00.000-05:00
    maplocal traffic
  • MAP
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    Start Time: 2024-04-08T11:41:00.000-05:00
    End Time: 2024-09-30T00:00:00.000-05:00
    maplocal traffic
  • MAP
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    Start Time: 2024-04-08T11:41:00.000-05:00
    End Time: 2024-09-30T00:00:00.000-05:00
    maplocal traffic
  • MAP
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
    Start Time: 2024-04-08T11:41:00.000-05:00
    End Time: 2024-09-30T00:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork at exit [10].
    Roadwork at exit [10].
    Start Time: 2024-06-11T08:43:25.000-05:00
    End Time: 2024-06-18T23:59:00.000-05:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US