Constructions near Exit 174 at South Rural Road
2024-05-25
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork from W Queen Creek Rd to S Dobson Rd / W Mockingbird Dr.
Roadwork from W Queen Creek Rd to S Dobson Rd / W Mockingbird Dr.
Start Time: 2024-05-20T11:25:24.000-06:00
End Time: 2024-05-28T00:59:00.000-06:00
map local traffic - MAPRoadwork from S Dobson Rd / W Mockingbird Dr to W Queen Creek Rd.
Roadwork from S Dobson Rd / W Mockingbird Dr to W Queen Creek Rd.
Start Time: 2024-05-20T11:25:24.000-06:00
End Time: 2024-05-28T00:59:00.000-06:00
map local traffic - MAPRoadwork from Phoenix to W Baseline Rd.
Roadwork from Phoenix to W Baseline Rd.
Start Time: 2024-05-24T02:30:35.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic - MAPSR-143 NB has been restricted to one lane with a reduced width. See vehicle length/width restrictions. Oversize trucks must use alt route.
SR-143 NB has been restricted to one lane with a reduced width. See vehicle length/width restrictions. Oversize trucks must use alt route.
Start Time: 2024-05-23T01:00:00.000-06:00
End Time: 2024-05-26T00:59:00.000-06:00
map local traffic - MAPThe eastbound I-10 off-ramp at 32nd Street will be closed from 12 a.m. Saturday, March 30, to 4 a.m. Monday, June 3, for ramp construction.
The eastbound I-10 off-ramp at 32nd Street will be closed from 12 a.m. Saturday, March 30, to 4 a.m. Monday, June 3, for ramp construction.
Start Time: 2024-04-12T03:55:24.000-06:00
End Time: 2024-05-26T00:59:00.000-06:00
map local traffic - MAPN 3rd St is closed from E Van Buren St to E Washington St (3rd St).
N 3rd St is closed from E Van Buren St to E Washington St (3rd St).
Start Time: 2024-05-24T13:39:00.000-06:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAPW McKinley St is closed from N 1st Ave to N 3rd Ave.
W McKinley St is closed from N 1st Ave to N 3rd Ave.
Start Time: 2024-05-24T08:19:37.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic - MAPRoadwork from S Priest Dr / W 7th St to W University Dr.
Roadwork from S Priest Dr / W 7th St to W University Dr.
Start Time: 2024-05-24T04:28:30.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic - MAPW Saint Anne Ave is closed from S Central Ave / E Saint Anne Ave to S Montezuma St.
W Saint Anne Ave is closed from S Central Ave / E Saint Anne Ave to S Montezuma St.
Start Time: 2024-05-24T04:00:20.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic - MAPW Saint Anne Ave is closed from S Montezuma St to S Central Ave / E Saint Anne Ave.
W Saint Anne Ave is closed from S Montezuma St to S Central Ave / E Saint Anne Ave.
Start Time: 2024-05-24T04:00:20.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic - MAPS 1st St is closed from E Washington St to E Jefferson St.
S 1st St is closed from E Washington St to E Jefferson St.
Start Time: 2024-05-24T01:00:00.000-06:00
End Time: 2024-05-26T00:59:59.000-06:00
map local traffic - MAPE Monroe St is closed from N Central Ave (Monroe St) to N 5th St.
E Monroe St is closed from N Central Ave (Monroe St) to N 5th St.
Start Time: 2024-05-22T12:03:00.000-06:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAPE Monroe St is closed from N 5th St to N Central Ave (Monroe St).
E Monroe St is closed from N 5th St to N Central Ave (Monroe St).
Start Time: 2024-05-22T11:43:00.000-06:00
End Time: 2024-05-26T00:59:00.000-06:00
map local traffic - MAPW Saint Catherine Ave is closed from S Central Ave / E Saint Catherine Ave to S Montezuma St.
W Saint Catherine Ave is closed from S Central Ave / E Saint Catherine Ave to S Montezuma St.
Start Time: 2024-05-22T06:04:00.000-06:00
End Time: 2024-05-29T00:59:00.000-06:00
map local traffic - MAPE Pierce St is closed from N 1st St to N Central Ave.
E Pierce St is closed from N 1st St to N Central Ave.
Start Time: 2024-05-20T05:47:35.000-06:00
End Time: 2024-05-28T00:59:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Baseline Rd to Broadway Rd.
Roadwork on S Central Ave from Baseline Rd to Broadway Rd.
Start Time: 2024-04-24T10:14:30.000-06:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAP40TH ST - CAMELBACK RD - Construction - Prelowers Mill and Overlay and Adjustments LanesRestricted: NB=1 SB=1 40TH ST - CAMELBACK RD Comments: 32nd st and Camelback Rd
40TH ST - CAMELBACK RD - Construction - Prelowers Mill and Overlay and Adjustments LanesRestricted: NB=1 SB=1 40TH ST - CAMELBACK RD Comments: 32nd st and Camelback Rd
Start Time: 2024-03-16T09:30:00.000-06:00
End Time: 2024-06-29T05:00:00.000-06:00
map local traffic - MAPBUCKEYE RD - WATKINS ST - Construction - Utility & Roadway Work LanesRestricted: NB=1 SB=1 BUCKEYE RD - WATKINS ST
BUCKEYE RD - WATKINS ST - Construction - Utility & Roadway Work LanesRestricted: NB=1 SB=1 BUCKEYE RD - WATKINS ST
Start Time: 2024-01-15T00:00:00.000-07:00
End Time: 2024-06-01T01:00:00.000-06:00
map local traffic - MAPRoadwork on S Central Ave from Broadway Rd to Baseline Rd.
Roadwork on S Central Ave from Broadway Rd to Baseline Rd.
Start Time: 2024-01-10T12:00:00.000-07:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAPLong term road construction on N Cooper Rd Both from S Cooper Rd to W Straford Ave. Starting 2023-11-16 3:12 PM.
Long term road construction on N Cooper Rd Both from S Cooper Rd to W Straford Ave. Starting 2023-11-16 3:12 PM.
Start Time: 2023-11-16T15:12:00.000-07:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAPLong term road construction on S Cooper Rd Both from W Smoke Tree Rd to N Cooper Rd. Starting 2023-11-16 3:10 PM.
Long term road construction on S Cooper Rd Both from W Smoke Tree Rd to N Cooper Rd. Starting 2023-11-16 3:10 PM.
Start Time: 2023-11-16T15:10:00.000-07:00
End Time: 2024-05-25T06:18:11.236-06:00
map local traffic - MAPBUCHANAN ST - GRANT ST - Construction - Track / OCS Wire Runs LanesRestricted: NB=1 BUCHANAN ST - GRANT ST
BUCHANAN ST - GRANT ST - Construction - Track / OCS Wire Runs LanesRestricted: NB=1 BUCHANAN ST - GRANT ST
Start Time: 2024-01-15T06:00:00.000-07:00
End Time: 2024-06-01T05:00:00.000-06:00
map local traffic - MAPCENTRAL AVE - 1ST AVE - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 1ST AVE
CENTRAL AVE - 1ST AVE - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 1ST AVE
Start Time: 2024-01-15T05:00:00.000-07:00
End Time: 2024-06-01T06:00:00.000-06:00
map local traffic - MAPCENTRAL AVE - 3RD ST - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 3RD ST
CENTRAL AVE - 3RD ST - Construction - Flash-Butt Welding LanesRestricted: EB ALL; WB ALL CENTRAL AVE - 3RD ST
Start Time: 2024-01-15T05:00:00.000-07:00
End Time: 2024-06-01T06:00:00.000-06:00
map local traffic - MAPRoadwork at S Central Ave.
Roadwork at S Central Ave.
Start Time: 2024-05-24T05:01:41.000-06:00
End Time: 2024-05-27T00:59:00.000-06:00
map local traffic