Constructions near Search Center
2024-06-12
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAP19th St NW is closed from State St NW / 17th St NW to Market St NW.
19th St NW is closed from State St NW / 17th St NW to Market St NW.
Start Time: 2024-06-12T04:28:47.000-05:00
End Time: 2024-06-14T22:59:00.000-05:00
map local traffic - MAP19th St NW is closed from Market St NW to State St NW / 17th St NW.
19th St NW is closed from Market St NW to State St NW / 17th St NW.
Start Time: 2024-06-12T04:28:47.000-05:00
End Time: 2024-06-14T22:59:00.000-05:00
map local traffic - MAPRoadwork on I-85 S / GA-403 S from 17th St exit [84] to I-75 S.
Roadwork on I-85 S / GA-403 S from 17th St exit [84] to I-75 S.
Start Time: 2024-06-05T12:05:08.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic - MAPRoad construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Road construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Start Time: 2024-04-26T20:00:00.000-05:00
End Time: 2024-07-25T20:30:00.000-05:00
map local traffic - MAPRoad construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Road construction on SR 42 both directions at W DRUID HILLS DR. All lanes closed.
Start Time: 2024-04-26T18:00:00.000-05:00
End Time: 2024-07-25T20:30:00.000-05:00
map local traffic - MAPRoadwork on GA-13 / Buford Hwy NE from US-23/GA-155/Clairmont Ter (GA-13) to GA-42/N Druid Hills Rd NE (GA-13).
Roadwork on GA-13 / Buford Hwy NE from US-23/GA-155/Clairmont Ter (GA-13) to GA-42/N Druid Hills Rd NE (GA-13).
Start Time: 2024-06-11T14:12:47.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic - MAPRoadwork on GA-154 / Memorial Dr SE from Maynard Ter (GA-154) to 2nd Ave (GA-154).
Roadwork on GA-154 / Memorial Dr SE from Maynard Ter (GA-154) to 2nd Ave (GA-154).
Start Time: 2024-06-11T08:00:00.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic - MAPRoadwork from Rugby Ave to College Park.
Roadwork from Rugby Ave to College Park.
Start Time: 2024-06-11T05:44:15.000-05:00
End Time: 2024-06-13T22:59:00.000-05:00
map local traffic - MAPPeachtree Circle NE is closed from The Prado NE to Peachtree St NE.
Peachtree Circle NE is closed from The Prado NE to Peachtree St NE.
Start Time: 2024-06-10T13:44:41.000-05:00
End Time: 2024-06-13T22:59:00.000-05:00
map local traffic - MAPWoodmere Dr NW is closed from McLendon Cir NW to Donald Lee Hollowell Pkwy NW.
Woodmere Dr NW is closed from McLendon Cir NW to Donald Lee Hollowell Pkwy NW.
Start Time: 2024-06-10T03:38:04.000-05:00
End Time: 2024-06-12T22:59:00.000-05:00
map local traffic - MAPWoodmere Dr NW is closed from Donald Lee Hollowell Pkwy NW to McLendon Cir NW.
Woodmere Dr NW is closed from Donald Lee Hollowell Pkwy NW to McLendon Cir NW.
Start Time: 2024-06-10T03:38:04.000-05:00
End Time: 2024-06-12T22:59:00.000-05:00
map local traffic - MAPMonroe Dr NE is closed from US-29/US-78/US-278/Ponce de Leon Ave NE to Piedmont Ave NE.
Monroe Dr NE is closed from US-29/US-78/US-278/Ponce de Leon Ave NE to Piedmont Ave NE.
Start Time: 2024-06-10T03:12:00.000-05:00
End Time: 2024-06-12T22:59:00.000-05:00
map local traffic - MAPMonroe Dr NE is closed from Piedmont Ave NE to Virginia Ave NE/10th St NE.
Monroe Dr NE is closed from Piedmont Ave NE to Virginia Ave NE/10th St NE.
Start Time: 2024-06-10T02:52:00.000-05:00
End Time: 2024-06-12T22:59:00.000-05:00
map local traffic - MAPVinings Oak Dr SE is closed from Vinings to Log Cabin Dr SE.
Vinings Oak Dr SE is closed from Vinings to Log Cabin Dr SE.
Start Time: 2024-06-07T05:41:53.000-05:00
End Time: 2024-06-14T22:59:00.000-05:00
map local traffic - MAPRoadwork on Monroe Dr NE from Piedmont Ave NE to Virginia Ave NE/10th St NE.
Roadwork on Monroe Dr NE from Piedmont Ave NE to Virginia Ave NE/10th St NE.
Start Time: 2024-06-11T10:11:30.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic - MAPRoadwork on Ashford Dunwoody Rd NE from Windsor Pkwy (Ashford Dunwoody Rd) to GA-141/Peachtree Rd (Ashford Dunwoody Rd).
Roadwork on Ashford Dunwoody Rd NE from Windsor Pkwy (Ashford Dunwoody Rd) to GA-141/Peachtree Rd (Ashford Dunwoody Rd).
Start Time: 2024-05-27T17:44:33.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic - MAPRoadwork on GA-42 / N Druid Hills Rd NE from I-85 (N Druid Hills Rd NE) to GA-13/Buford Hwy (N Druid Hills Rd NE).
Roadwork on GA-42 / N Druid Hills Rd NE from I-85 (N Druid Hills Rd NE) to GA-13/Buford Hwy (N Druid Hills Rd NE).
Start Time: 2024-05-16T13:00:44.000-05:00
End Time: 2024-06-12T07:23:11.219-05:00
map local traffic