know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along ga-400

GA 400


State Route 400 (Georgia 400, SR 400) is a highway in the U.S. state of Georgia, concurrent with U.S. Route 19 (US 19) from exit 4B until its terminus just south of Dahlonega. SR 400 goes from Atlanta, at Interstate 85 (I-85), to Buckhead, Sandy Springs, Roswell, Alpharetta, Cumming, Dawson County, and Dahlonega. Like the Interstate Highways, it is a limited-access road (with exit ramps instead of intersections), but unlike the interstates (which were renumbered by the GDOT in 2000), the exit numbers do not indicate mileage: they still go up sequentially one-by-one. Once SR 400 passes exit 17 (SR 306), it changes from a limited-access expressway into an at-grade divided highway with traffic lights, but still with a high speed limit of 65 miles per hour (105 km/h) and ends at the J.B. Jones Intersection at SR 60 in Lumpkin County.

Between I-85 and I-285, SR 400 is designated "T. Harvey Mathis Parkway"; upon reaching the Perimeter (I-285) and beyond, the highway is designated "Turner McDonald Parkway". SR 400 is known locally as the "Georgia Autobahn", the "North Georgia Autobahn", or the "Alpharetta Autobahn" due to the prevalence of speeding.

Georgia State Route 400 begins at Interstate 85 just north of Downtown Atlanta and starts as a toll road through Buckhead. At Interstate 285, the road becomes a free road, heading north into the northern Atlanta suburbs. The freeway section ends at SR 306 and SR 400 continues as a surface road until reaching its end at US 19/SR 60/SR 115.

Planning for Georgia 400 began in 1954. The initial section north of I-285 was officially dedicated on May 24, 1971 and subsequent additions to the north opened in stages through 1981. The road was subsequently widened in 1989 from its original four-lane configuration to eight lanes between I-285 and Holcomb Bridge Road. The widening projects were necessitated by the massive growth that Georgia 400 brought to northern Fulton and southern Forsyth counties.

In December 2005, the Georgia Department of Transportation began widening the section from Holcomb Bridge Road to Windward Parkway from three to four lanes in the northbound direction and from two to four lanes from Windward Parkway to McFarland Parkway. Southbound, the highway is being widened to four lanes between McFarland Parkway and Holcomb Bridge Road. In addition, metal noise barrier walls and a concrete divider in the median were also added.

As of 2010[update], a half-diamond interchange is being added on the north side of Hammond Drive, allowing southbound exits and northbound entrances.

The southern section of Georgia 400 (from I-285 to I-85) was the last section to be constructed. It was the only active toll road in Georgia, after the Torras Causeway toll between Brunswick and St. Simons Island on the southeastern Georgia coast was removed in 2003, until the high occupancy toll Express Lanes opened on I-85 in 2011. The GA 400 toll was to expire in 2011 after 20 years. However, Sonny Perdue and members of the state's road and tollway authority voted on September 24, 2010 to keep the tolls on 400 until 2020. The 10-year extension will fund 11 new projects on the highway.

At one time, Georgia 400 was to connect to Interstate 675 in southeast DeKalb county; however, residents in Intown Atlanta neighborhoods did not want the highway to cut through their neighborhoods, and a freeway revolt ensued, ending when Jimmy Carter had the plan terminated while he was governor of Georgia. This freeway was to be known as Interstate 475 (a number now used for the Macon bypass), a parallel route to the Downtown Connector which is 2.5 miles further west through downtown and midtown. The point where this road would have had its interchange with the also-doomed Interstate 485 (now Freedom Parkway and Georgia 10 to Stone Mountain Expressway) is now the site of the Jimmy Carter Presidential Library. A later routing of I-485 would have had that number running from the Downtown Connector (I-75/85), west to the current library, then north on what is now GA400.

Nonetheless, the northern portion of the inside-the-Perimeter route remained alive, and after lawsuits by residents that spent numerous years in court, GDOT was able to force the extension through Buckhead. Dozens of homes were taken through eminent domain or the threat of it, and the highway was built right though the middle of formerly-secluded and forested neighborhoods. Many remaining residents now live on dead end streets with significant noise pollution or unsightly metal barrier walls.

The road opened to traffic on August 1, 1993, after three years of construction. Existing exits were renumbered up by four to accommodate the extension, which has a single toll plaza in the middle of its length. Contrary to public belief, the bonds that funded the construction of Georgia 400 south of I-285 will not be paid off until 2011. There is also currently no direct access from Georgia 400 southbound to I-85 northbound or vice versa, except by an indirect route via Sidney Marcus Boulevard. In addition, the North Line for Atlanta's MARTA system was constructed in the median from the Glenridge Connector to south of Lenox Road, and was opened on June 8, 1996.

The Georgia 400 toll plaza, operated by the State Road and Tollway Authority (SRTA), collects 50-cent tolls in both the northbound and southbound directions. Each direction has two open-road toll lanes, which collect tolls at highway speeds using the Georgia Peach Pass electronic tag (formerly "Cruise Card"), and seven gated toll lanes which accept cash. The toll facility handles a total of approximately 120,000 vehicles per day. About 37% of transactions are paid via Peach Pass. The same technology is also used by SunPass in Florida, TxTag in Texas, and PikePass in Oklahoma; however, none of these has an agreement to accept the tags of the others.

In March 2009, local TV news reports brought up an issue regarding tolls on the road, since SRTA reported that enough money has been collected to pay the bonds used to construct the road (though prepayment prior to 2011 is prohibited). However, despite promises that the toll would be removed once the road was paid for, the tolls continue to be collected. The road costs two million dollars per year just to maintain (plus occasional repaving), and it would cost several million more for the demolition of the toll plaza. One solution would be to simply close the toll plaza, allowing drivers to pass through without paying. If this were to occur, the state would have to raise money through other resources for new road projects, such as the reconstruction of the tollway's northern interchange at I-285, expected to cost two billion dollars. On July 19, 2012, Governor Nathan Deal announced that the toll barrier on SR 400 will be removed by the end of 2013.

A revival of the connection to I-675 was proposed in 2009. A tunnel would go under East Atlanta and other neighborhoods of Atlanta on the DeKalb side, south to I-20. A surface road would then go south to 675. The project would be a public/private initiative.

The toll plaza is located north of Lenox Road (Exit 2). Tolls are collected in both directions. The toll is 50 cents for a 2-axle vehicle, $1.50 for 3 axles, plus 50 cents for each additional axle. Tolls are not collected on ramps. In July 2012 two weeks before voters of Georgia would vote on the Transportation Referendum act Georgia Governor Nathan Deal said that the toll on GA 400 would be abandoned in December 2013 starting of 2014 with GA 400 as a toll free road.

In 2012, a feasibility study was initiated by the Georgia Department of Transportation to explore the possibility of adding tolled express lanes. The proposed express lanes would be 24 miles long, and mirror the existing lanes on Interstate 85. The lanes' southern terminus will be Interstate 285 in Sandy Springs, and their northern terminus would be State Route 20 in Cumming. Fees would be similar to the existing I-85 lanes, and will be paid using PeachPass, making the express lanes compatible with the existing toll booth near Lenox Drive and the existing express lanes on I-85.







Thank you for using Roadnow

Roadnow US