Constructions near I-278 at I-87
2024-05-14
Roadnow
type a number or name to filter
- MAPRoadwork on I-95 N / US-9 N / US-1 N from Lemoine Ave (NJ-67) exit [73] to exit [1].
Roadwork on I-95 N / US-9 N / US-1 N from Lemoine Ave (NJ-67) exit [73] to exit [1].
Start Time: 2024-05-14T04:31:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on FDR Dr S from I-278/Triborough Bridge/Exit 17 (FDR Dr) to 106th St/Exit 15 (FDR Dr).
Roadwork on FDR Dr S from I-278/Triborough Bridge/Exit 17 (FDR Dr) to 106th St/Exit 15 (FDR Dr).
Start Time: 2024-05-14T03:48:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPJerome St is closed from Pitkin Ave to Glenmore Ave.
Jerome St is closed from Pitkin Ave to Glenmore Ave.
Start Time: 2024-05-14T03:18:16.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPBruckner Blvd is closed from Barretto St to I-278/Sheridan Expy.
Bruckner Blvd is closed from Barretto St to I-278/Sheridan Expy.
Start Time: 2024-05-14T03:16:34.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPSaratoga Ave is closed from Dumont Ave to Livonia Ave.
Saratoga Ave is closed from Dumont Ave to Livonia Ave.
Start Time: 2024-05-14T03:13:02.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAP48th Ave is closed from Van Dam St to Long Island Expy W / 30th St.
48th Ave is closed from Van Dam St to Long Island Expy W / 30th St.
Start Time: 2024-05-14T03:01:30.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPRoadwork from State Rt 3 to State Route 3.
Roadwork from State Rt 3 to State Route 3.
Start Time: 2024-05-14T02:59:28.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPIsham St is closed from Seaman Ave to Broadway.
Isham St is closed from Seaman Ave to Broadway.
Start Time: 2024-05-14T02:50:51.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on I-678 S from Toll Plaza (I-678) to 3rd Ave (I-678).
Roadwork on I-678 S from Toll Plaza (I-678) to 3rd Ave (I-678).
Start Time: 2024-05-14T02:47:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on 81st Rd at Woodhaven Blvd.
Roadwork on 81st Rd at Woodhaven Blvd.
Start Time: 2024-05-14T02:47:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPI-478 W is closed from exit [25] to Brooklyn Battery Tunl W.
I-478 W is closed from exit [25] to Brooklyn Battery Tunl W.
Start Time: 2024-05-14T02:17:05.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPSeaman Ave is closed from W 214th St to W 207th St.
Seaman Ave is closed from W 214th St to W 207th St.
Start Time: 2024-05-14T02:14:19.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAP2nd st is closed from Washington St to Bloomfield St.
2nd st is closed from Washington St to Bloomfield St.
Start Time: 2024-05-14T01:59:53.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPHarrod Pl is closed from Westchester Ave / Harrod Ave to Morrison Ave.
Harrod Pl is closed from Westchester Ave / Harrod Ave to Morrison Ave.
Start Time: 2024-05-14T01:57:39.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPBronx Terrace is closed from Yonkers Ave to Yonkers Ter.
Bronx Terrace is closed from Yonkers Ave to Yonkers Ter.
Start Time: 2024-05-14T01:47:36.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPBronx Terrace is closed from Yonkers Ter to Yonkers Ave.
Bronx Terrace is closed from Yonkers Ter to Yonkers Ave.
Start Time: 2024-05-14T01:47:36.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPBruner Ave is closed from Nereid Ave to Pitman Ave.
Bruner Ave is closed from Nereid Ave to Pitman Ave.
Start Time: 2024-05-14T01:39:15.000-04:00
End Time: 2024-05-17T23:59:00.000-04:00
map directions local traffic - MAPBruner Ave is closed from Pitman Ave to Nereid Ave.
Bruner Ave is closed from Pitman Ave to Nereid Ave.
Start Time: 2024-05-14T01:39:15.000-04:00
End Time: 2024-05-17T23:59:00.000-04:00
map directions local traffic - MAPExeter St is closed from Bow St to 71st Ave.
Exeter St is closed from Bow St to 71st Ave.
Start Time: 2024-05-14T01:37:06.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPExeter St is closed from 71st Ave to Bow St.
Exeter St is closed from 71st Ave to Bow St.
Start Time: 2024-05-14T01:37:06.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPRockdale Ave is closed from 2nd St / Beechwood Ave to Kings Hwy.
Rockdale Ave is closed from 2nd St / Beechwood Ave to Kings Hwy.
Start Time: 2024-05-14T01:36:11.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPRockdale Ave is closed from Kings Hwy to 2nd St / Beechwood Ave.
Rockdale Ave is closed from Kings Hwy to 2nd St / Beechwood Ave.
Start Time: 2024-05-14T01:36:11.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAP55th Dr is closed from 60th St to Borden Ave.
55th Dr is closed from 60th St to Borden Ave.
Start Time: 2024-05-14T01:14:02.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPJones Rd is closed from Mountain Rd to E Palisade Ave / Brayton St.
Jones Rd is closed from Mountain Rd to E Palisade Ave / Brayton St.
Start Time: 2024-05-14T01:13:52.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPJones Rd is closed from E Palisade Ave / Brayton St to Mountain Rd.
Jones Rd is closed from E Palisade Ave / Brayton St to Mountain Rd.
Start Time: 2024-05-14T01:13:52.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPLivingston St is closed from Brooklyn Bridge Blvd/Boerum Pl to Nevins St/Flatbush Ave.
Livingston St is closed from Brooklyn Bridge Blvd/Boerum Pl to Nevins St/Flatbush Ave.
Start Time: 2024-05-14T01:11:22.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPTiebout Ave is closed from E 188th St to E 187th St.
Tiebout Ave is closed from E 188th St to E 187th St.
Start Time: 2024-05-14T01:03:31.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPAnderson Ave is closed from S Demarest Ave to Roosevelt Ave.
Anderson Ave is closed from S Demarest Ave to Roosevelt Ave.
Start Time: 2024-05-14T00:57:03.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPAnderson Ave is closed from Roosevelt Ave to S Demarest Ave.
Anderson Ave is closed from Roosevelt Ave to S Demarest Ave.
Start Time: 2024-05-14T00:57:03.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPPearson Pl is closed from Skillman Ave to 27th St.
Pearson Pl is closed from Skillman Ave to 27th St.
Start Time: 2024-05-14T00:56:44.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPPearson Pl is closed from 27th St to Skillman Ave.
Pearson Pl is closed from 27th St to Skillman Ave.
Start Time: 2024-05-14T00:56:44.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on I-495 W from Main St/Exit 23 (I-495) to I-678/Exit 22 (I-495).
Roadwork on I-495 W from Main St/Exit 23 (I-495) to I-678/Exit 22 (I-495).
Start Time: 2024-05-14T00:47:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPWythe Pl is closed from Grand Concourse / E 170th St to E 171st St.
Wythe Pl is closed from Grand Concourse / E 170th St to E 171st St.
Start Time: 2024-05-14T00:44:04.000-04:00
End Time: 2024-05-21T23:59:00.000-04:00
map directions local traffic - MAP3rd st is closed from 27th Ave to 26th Ave.
3rd st is closed from 27th Ave to 26th Ave.
Start Time: 2024-05-14T00:28:34.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPLincoln St is closed from 135th St to Linden Blvd.
Lincoln St is closed from 135th St to Linden Blvd.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPThames St is closed from Trinity Pl to Broadway.
Thames St is closed from Trinity Pl to Broadway.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPW 215th St is closed from Seaman Ave to Broadway / W 218th St.
W 215th St is closed from Seaman Ave to Broadway / W 218th St.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPCanal St is closed from Rutgers St / Essex St to Allen St.
Canal St is closed from Rutgers St / Essex St to Allen St.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPStanhope St is closed from Woodward Ave to Onderdonk Ave.
Stanhope St is closed from Woodward Ave to Onderdonk Ave.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPStanhope St is closed from Onderdonk Ave to Woodward Ave.
Stanhope St is closed from Onderdonk Ave to Woodward Ave.
Start Time: 2024-05-14T00:00:00.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPSummit Ave is closed from Communipaw Ave/Garfield Ave/Grand St to Montgomery St.
Summit Ave is closed from Communipaw Ave/Garfield Ave/Grand St to Montgomery St.
Start Time: 2024-05-13T23:56:16.000-04:00
End Time: 2024-05-20T23:59:00.000-04:00
map directions local traffic - MAPRoadwork from New County Rd (Seaview Dr) to I-95/New Jersey Tpke (Seaview Dr).
Roadwork from New County Rd (Seaview Dr) to I-95/New Jersey Tpke (Seaview Dr).
Start Time: 2024-05-13T23:35:30.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPSeaman Ave is closed from Riverside Dr to W 204th St.
Seaman Ave is closed from Riverside Dr to W 204th St.
Start Time: 2024-05-13T23:34:19.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAP2nd st is closed from Paterson Plank Rd to Bergenline Ave.
2nd st is closed from Paterson Plank Rd to Bergenline Ave.
Start Time: 2024-05-13T23:30:47.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPBerry St is closed from N 8th St to N 7th St.
Berry St is closed from N 8th St to N 7th St.
Start Time: 2024-05-13T23:17:37.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPBerry St is closed from N 6th St to N 8th St.
Berry St is closed from N 6th St to N 8th St.
Start Time: 2024-05-13T23:17:37.000-04:00
End Time: 2024-05-16T23:59:59.000-04:00
map directions local traffic - MAPPort Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:30 AM All lanes closed and detoured, Friday May 17th, 2024 thru Saturday May 18th, 2024, 11:59 PM thru 09:00 AM All lanes closed and detoured
Port Authority NY/NJ: construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:30 AM All lanes closed and detoured, Friday May 17th, 2024 thru Saturday May 18th, 2024, 11:59 PM thru 09:00 AM All lanes closed and detoured
Start Time: 2024-05-13T23:00:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on I-278 eastbound from Clinton Street; Huntington Street (Brooklyn) to westbound I-478 at Van Brunt Street (Brooklyn) Subject to change without notice., Monday May 13th,2024 thru Saturday May 18th,2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed northbound,
NYSDOT - Region 11: construction on I-278 eastbound from Clinton Street; Huntington Street (Brooklyn) to westbound I-478 at Van Brunt Street (Brooklyn) Subject to change without notice., Monday May 13th,2024 thru Saturday May 18th,2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed northbound,
Start Time: 2024-05-13T23:00:00.000-04:00
End Time: 2024-05-14T05:00:00.000-04:00
map directions local traffic - MAPE 165th St is closed from Westchester Ave to Westchester Ave / Hoe Ave.
E 165th St is closed from Westchester Ave to Westchester Ave / Hoe Ave.
Start Time: 2024-05-13T22:59:13.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPW 35th St is closed from 5th Ave / E 35th St to Broadway.
W 35th St is closed from 5th Ave / E 35th St to Broadway.
Start Time: 2024-05-13T22:31:00.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPNYSDOT - Region 11: Construction, construction on Ed Koch Queensboro Bridge Lower Level Outer eastbound between Manhattan Side (Manhattan) and Queens Side (New York) All lanes closed until 6:00 A.M.
NYSDOT - Region 11: Construction, construction on Ed Koch Queensboro Bridge Lower Level Outer eastbound between Manhattan Side (Manhattan) and Queens Side (New York) All lanes closed until 6:00 A.M.
Start Time: 2024-05-13T21:00:15.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on I-278 eastbound from Tiffany Street (New York) to Whittier Street (New York) Subject to change without notice., Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Friday May 17th, 2024 thru Saturday May 18th, 2024, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed
NYSDOT - Region 11: construction on I-278 eastbound from Tiffany Street (New York) to Whittier Street (New York) Subject to change without notice., Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Friday May 17th, 2024 thru Saturday May 18th, 2024, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed
Start Time: 2024-05-13T20:53:29.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPI-95 S is closed from US-46 (I-95) to New Jersey Tpke E Spur/New Jersey Tpke W Spur (I-95).
I-95 S is closed from US-46 (I-95) to New Jersey Tpke E Spur/New Jersey Tpke W Spur (I-95).
Start Time: 2024-05-13T20:33:30.000-04:00
End Time: 2024-05-21T23:59:59.000-04:00
map directions local traffic - MAPS 4th St is closed from Havemeyer St to Brooklyn Queens Expy / Borinquen Pl.
S 4th St is closed from Havemeyer St to Brooklyn Queens Expy / Borinquen Pl.
Start Time: 2024-05-13T20:20:26.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on I-278 E from NY-27/Prospect Expy/Exit 24 (I-278) to Hamilton Ave/Exit 26 (I-278).
Roadwork on I-278 E from NY-27/Prospect Expy/Exit 24 (I-278) to Hamilton Ave/Exit 26 (I-278).
Start Time: 2024-05-13T09:56:49.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork from E 37th St/2nd Ave (I-495) to E 34th St (Tunnel Exit St/I-495).
Roadwork from E 37th St/2nd Ave (I-495) to E 34th St (Tunnel Exit St/I-495).
Start Time: 2024-05-13T08:10:08.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on Bronx River Parkway northbound from I-278 - Bruckner Expressway (New York) to East 180th Street; Morris Park Avenue (New York) Subject to change without notice., Monday May 6th, 2024 thru Friday May 17th, 2024, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 6th, 2024 thru Friday May 17th, 2024, Monday thru Friday, 10:00 PM thru 11:00 PM 1 Right lane of 3 lanes closed, Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed
NYSDOT - Region 11: construction on Bronx River Parkway northbound from I-278 - Bruckner Expressway (New York) to East 180th Street; Morris Park Avenue (New York) Subject to change without notice., Monday May 6th, 2024 thru Friday May 17th, 2024, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday May 6th, 2024 thru Friday May 17th, 2024, Monday thru Friday, 10:00 PM thru 11:00 PM 1 Right lane of 3 lanes closed, Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed
Start Time: 2024-05-12T23:00:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on Bronx River Parkway southbound from Nereid Avenue (New York) to East 233rd Street (New York) Subject to change without notice., Monday April 29th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed
NYSDOT - Region 11: construction on Bronx River Parkway southbound from Nereid Avenue (New York) to East 233rd Street (New York) Subject to change without notice., Monday April 29th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed
Start Time: 2024-05-12T23:00:00.000-04:00
End Time: 2024-05-14T05:00:00.000-04:00
map directions local traffic - MAPConstruction on I-478 westbound from Van Brunt Street (Brooklyn) to Clinton Street (New York) Subject to change without notice., Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed
Construction on I-478 westbound from Van Brunt Street (Brooklyn) to Clinton Street (New York) Subject to change without notice., Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed
Start Time: 2024-05-12T22:00:00.000-04:00
End Time: 2024-05-14T05:00:00.000-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on I-678 southbound from Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway (New York) to College Point Boulevard; I-678 (New York) Subject to change without notice., Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed
NYSDOT - Region 11: construction on I-678 southbound from Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway (New York) to College Point Boulevard; I-678 (New York) Subject to change without notice., Monday May 6th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed
Start Time: 2024-05-12T22:00:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-95 N from NJ-4 (I-95 Exp) to Center Ave (I-95 Exp).
Roadwork on I-95 N from NJ-4 (I-95 Exp) to Center Ave (I-95 Exp).
Start Time: 2024-05-12T15:46:12.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-95 N from NJ-4 (I-95) to US-9/US-1/US-46/Exit 72 (I-95).
Roadwork on I-95 N from NJ-4 (I-95) to US-9/US-1/US-46/Exit 72 (I-95).
Start Time: 2024-05-12T13:45:19.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-495 W from 108th St/Exit 21 (I-495) to Woodhaven Blvd (I-495).
Roadwork on I-495 W from 108th St/Exit 21 (I-495) to Woodhaven Blvd (I-495).
Start Time: 2024-05-12T12:44:46.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on Palisades Interstate Pkwy from Palisades Interstate Pkwy/US-9W/Fletcher Ave (Palisades Interstate Pkwy) to I-95/US-9/US-1 (Palisades Interstate Pkwy).
Roadwork on Palisades Interstate Pkwy from Palisades Interstate Pkwy/US-9W/Fletcher Ave (Palisades Interstate Pkwy) to I-95/US-9/US-1 (Palisades Interstate Pkwy).
Start Time: 2024-05-11T22:01:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-95 N from exit [71] to NJ-67 exit [73].
Roadwork on I-95 N from exit [71] to NJ-67 exit [73].
Start Time: 2024-05-11T21:43:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPPort Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Monday May 13th, 2024 thru Thursday May 16th, 2024, Monday/Tuesday/Wednesday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Thursday May 16th, 2024 thru Friday May 17th, 2024, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed
Port Authority NY/NJ: construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Monday May 13th, 2024 thru Thursday May 16th, 2024, Monday/Tuesday/Wednesday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Thursday May 16th, 2024 thru Friday May 17th, 2024, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed
Start Time: 2024-05-11T15:40:25.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on NJ-495 E from Weehawken to Lincoln Tunl E.
Roadwork on NJ-495 E from Weehawken to Lincoln Tunl E.
Start Time: 2024-05-11T10:39:08.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-278 E from Bronx River Ave (Bronx) (North) (I-278) to White Plains Rd (I-278).
Roadwork on I-278 E from Bronx River Ave (Bronx) (North) (I-278) to White Plains Rd (I-278).
Start Time: 2024-05-11T01:36:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-495 E from 80th St/Exit 19 (I-495) to Woodhaven Blvd (I-495).
Roadwork on I-495 E from 80th St/Exit 19 (I-495) to Woodhaven Blvd (I-495).
Start Time: 2024-05-10T19:36:12.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-278 E from Atlantic Ave/Exit 27 (I-278) to Brooklyn Bridge/Cadman Plz/Exit 28 (I-278).
Roadwork on I-278 E from Atlantic Ave/Exit 27 (I-278) to Brooklyn Bridge/Cadman Plz/Exit 28 (I-278).
Start Time: 2024-05-07T06:20:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-678 S from Grand Central Pkwy/Exit 10 (I-678) to Hillside Ave/Exit 6 (I-678).
Roadwork on I-678 S from Grand Central Pkwy/Exit 10 (I-678) to Hillside Ave/Exit 6 (I-678).
Start Time: 2024-05-06T00:00:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on NY-9A S from 232nd St/Exit 19 (NY-9A) to Henry Hudson Bridge Toll Plaza (NY-9A).
Roadwork on NY-9A S from 232nd St/Exit 19 (NY-9A) to Henry Hudson Bridge Toll Plaza (NY-9A).
Start Time: 2024-05-05T12:14:58.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on NJ-495 E from Toll Plaza (NJ-495) to 39th St/40th St (NY-495).
Roadwork on NJ-495 E from Toll Plaza (NJ-495) to 39th St/40th St (NY-495).
Start Time: 2024-05-05T11:06:03.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on I-895 southbound ramp to Exit - Westchester Avenue (New York) Ramp to W/B Bruckner Expressway., Continuous Monday April 1st, 2024 07:00 AM thru Tuesday December 31st, 2024 07:00 AM All lanes closed
NYSDOT - Region 11: construction on I-895 southbound ramp to Exit - Westchester Avenue (New York) Ramp to W/B Bruckner Expressway., Continuous Monday April 1st, 2024 07:00 AM thru Tuesday December 31st, 2024 07:00 AM All lanes closed
Start Time: 2024-04-01T07:00:00.000-04:00
End Time: 2024-12-31T23:59:00.000-05:00
map directions local traffic - MAPNYSDOT - Region 11: construction on I-278 westbound from Bronx River Avenue (New York) to Hunts Point Avenue; Exit 49 - I-895-Sheridan Expressway (New York) Subject to change without notice., Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Friday May 17th, 2024 thru Saturday May 18th, 2024, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed
NYSDOT - Region 11: construction on I-278 westbound from Bronx River Avenue (New York) to Hunts Point Avenue; Exit 49 - I-895-Sheridan Expressway (New York) Subject to change without notice., Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Friday May 17th, 2024 thru Saturday May 18th, 2024, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed
Start Time: 2024-02-09T15:07:57.000-05:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on Bronx River Parkway northbound from East 233rd Street (New York) to Nereid Avenue (New York) Subject to change without notice., Monday April 29th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed
NYSDOT - Region 11: construction on Bronx River Parkway northbound from East 233rd Street (New York) to Nereid Avenue (New York) Subject to change without notice., Monday April 29th, 2024 thru Saturday May 18th, 2024, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed
Start Time: 2023-12-10T08:36:00.000-05:00
End Time: 2024-05-14T05:00:00.000-04:00
map directions local traffic - MAPRoadwork on Whitlock Ave from Westchester Ave to Bruckner Blvd.
Roadwork on Whitlock Ave from Westchester Ave to Bruckner Blvd.
Start Time: 2024-05-14T00:47:30.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPAstor Pl is closed from 4th Ave/Lafayette St to Broadway.
Astor Pl is closed from 4th Ave/Lafayette St to Broadway.
Start Time: 2024-05-13T20:33:00.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPVyse Ave is closed from E 172nd St to E 173rd St.
Vyse Ave is closed from E 172nd St to E 173rd St.
Start Time: 2024-05-13T17:06:37.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on Marin Blvd from 12th St to Holland Tunl E.
Roadwork on Marin Blvd from 12th St to Holland Tunl E.
Start Time: 2024-05-13T15:45:02.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPW 218th St is closed from Broadway to Park Ter W.
W 218th St is closed from Broadway to Park Ter W.
Start Time: 2024-05-13T09:38:00.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPW 180th St is closed from Broadway to Saint Nicholas Ave.
W 180th St is closed from Broadway to Saint Nicholas Ave.
Start Time: 2024-05-13T09:16:34.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPRiver Ave is closed from Gerard Ave / E 140th St to Exterior St.
River Ave is closed from Gerard Ave / E 140th St to Exterior St.
Start Time: 2024-05-13T07:23:30.000-04:00
End Time: 2024-05-14T23:59:00.000-04:00
map directions local traffic - MAP71st Ave is closed from Queens Blvd to Austin St.
71st Ave is closed from Queens Blvd to Austin St.
Start Time: 2024-05-13T05:47:13.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPFront St is closed from Brooklyn Brg to Pearl St.
Front St is closed from Brooklyn Brg to Pearl St.
Start Time: 2024-05-13T00:56:23.000-04:00
End Time: 2024-05-20T23:59:00.000-04:00
map directions local traffic - MAPW 30th St is closed from 6th Ave to Broadway.
W 30th St is closed from 6th Ave to Broadway.
Start Time: 2024-05-13T00:00:00.000-04:00
End Time: 2024-05-21T23:59:59.000-04:00
map directions local traffic - MAPMalt Dr is closed from 54th Ave to 2nd St / 55th Ave.
Malt Dr is closed from 54th Ave to 2nd St / 55th Ave.
Start Time: 2024-05-12T20:43:34.000-04:00
End Time: 2024-05-19T23:59:00.000-04:00
map directions local traffic - MAPMalt Dr is closed from 2nd St / 55th Ave to 54th Ave.
Malt Dr is closed from 2nd St / 55th Ave to 54th Ave.
Start Time: 2024-05-12T20:43:34.000-04:00
End Time: 2024-05-19T23:59:00.000-04:00
map directions local traffic - MAPRoadwork from Bruckner Blvd to Bruckner Expy E.
Roadwork from Bruckner Blvd to Bruckner Expy E.
Start Time: 2024-05-12T18:47:01.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPRoadwork on I-78 E / NJ-139 / 12th st from I-78/Jersey Ave (12th St) to Marin Blvd (12th St).
Roadwork on I-78 E / NJ-139 / 12th st from I-78/Jersey Ave (12th St) to Marin Blvd (12th St).
Start Time: 2024-05-12T17:46:35.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPBroadway Alley is closed from E 26th St to E 27th St.
Broadway Alley is closed from E 26th St to E 27th St.
Start Time: 2024-05-12T10:35:34.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPCatherine Ln is closed from Broadway to Lafayette St.
Catherine Ln is closed from Broadway to Lafayette St.
Start Time: 2024-05-12T03:05:01.000-04:00
End Time: 2024-05-14T23:59:00.000-04:00
map directions local traffic - MAPW 58th St is closed from W 59th St exit [8] to 9th Ave.
W 58th St is closed from W 59th St exit [8] to 9th Ave.
Start Time: 2024-05-12T02:27:38.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPE 41st St is closed from Lexington Ave to 3rd Ave.
E 41st St is closed from Lexington Ave to 3rd Ave.
Start Time: 2024-05-09T17:58:31.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPRoadwork from Atlantic Ave to Brooklyn Queens Expy.
Roadwork from Atlantic Ave to Brooklyn Queens Expy.
Start Time: 2024-05-07T17:19:33.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPBarrow St is closed from Christopher Columbus Dr to Newark Ave.
Barrow St is closed from Christopher Columbus Dr to Newark Ave.
Start Time: 2024-05-07T01:50:00.000-04:00
End Time: 2024-05-17T23:59:00.000-04:00
map directions local traffic - MAP16th st is closed from Coles St to Jersey Ave.
16th st is closed from Coles St to Jersey Ave.
Start Time: 2024-05-02T03:05:48.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAP16th st is closed from Jersey Ave to Coles St.
16th st is closed from Jersey Ave to Coles St.
Start Time: 2024-05-02T03:05:48.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on Bruckner Blvd from I-678/Brush Ave/Hutchinson River Pkwy to Cross Bronx Expy/Havemeyer Ave.
Roadwork on Bruckner Blvd from I-678/Brush Ave/Hutchinson River Pkwy to Cross Bronx Expy/Havemeyer Ave.
Start Time: 2024-03-13T06:29:00.000-04:00
End Time: 2024-05-14T06:39:23.694-04:00
map directions local traffic - MAPAnchorage Pl is closed from Manhattan Brg N / Plymouth St to Pearl St.
Anchorage Pl is closed from Manhattan Brg N / Plymouth St to Pearl St.
Start Time: 2023-11-06T13:44:08.000-05:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on Meeker Ave from Graham Ave to Metropolitan Ave (Brooklyn Queens Expy/Meeker Ave).
Roadwork on Meeker Ave from Graham Ave to Metropolitan Ave (Brooklyn Queens Expy/Meeker Ave).
Start Time: 2024-05-12T18:06:30.000-04:00
End Time: 2024-05-14T06:39:23.695-04:00
map directions local traffic - MAPRoadwork on 94th Ave from Lefferts Blvd (Atlantic Ave) to Sutphin Blvd.
Roadwork on 94th Ave from Lefferts Blvd (Atlantic Ave) to Sutphin Blvd.
Start Time: 2024-05-10T21:36:30.000-04:00
End Time: 2024-05-14T06:39:23.695-04:00
map directions local traffic - MAPNYSDOT - Region 11: construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Friday May 3rd, 2024 12:00 AM thru Friday May 31st, 2024 11:59 PM 1 Left lane of 3 lanes closed service road
NYSDOT - Region 11: construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Friday May 3rd, 2024 12:00 AM thru Friday May 31st, 2024 11:59 PM 1 Left lane of 3 lanes closed service road
Start Time: 2024-05-03T00:00:00.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map directions local traffic - MAPRoadwork on Livingston St from Clinton St / Aitken Pl to Court St.
Roadwork on Livingston St from Clinton St / Aitken Pl to Court St.
Start Time: 2024-05-10T06:04:30.000-04:00
End Time: 2024-05-14T21:25:00.000-04:00
map directions local traffic - MAPRoadwork on Bruckner Blvd from Bronx River Pkwy/Morrison Ave to I-278/Bronx River Ave/Bruckner Expy.
Roadwork on Bruckner Blvd from Bronx River Pkwy/Morrison Ave to I-278/Bronx River Ave/Bruckner Expy.
Start Time: 2024-04-29T11:43:00.000-04:00
End Time: 2024-05-14T06:39:23.695-04:00
map directions local traffic - MAPRoadwork on 11th Ave from W 37th St to W 40th St.
Roadwork on 11th Ave from W 37th St to W 40th St.
Start Time: 2024-02-06T11:36:30.000-05:00
End Time: 2024-05-14T06:39:23.695-04:00
map directions local traffic - MAPNYSDOT - Region 11: Construction, construction on Ed Koch Queensboro Bridge Lower Level Outer eastbound between Manhattan Side (Manhattan) and Queens Side (New York) All lanes closed until 6:00 A.M.
NYSDOT - Region 11: Construction, construction on Ed Koch Queensboro Bridge Lower Level Outer eastbound between Manhattan Side (Manhattan) and Queens Side (New York) All lanes closed until 6:00 A.M.
Start Time: 2024-05-13T21:00:15.000-04:00
End Time: 2024-05-14T06:47:14.207-04:00
map directions local traffic - MAPRoadwork from Whitestone Expy / Ulmer St to Whitestone Expy S.
Roadwork from Whitestone Expy / Ulmer St to Whitestone Expy S.
Start Time: 2024-05-09T09:32:42.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPBerry St is closed from N 10th St to N 9th St.
Berry St is closed from N 10th St to N 9th St.
Start Time: 2024-05-13T12:59:54.000-04:00
End Time: 2024-05-20T23:59:00.000-04:00
map directions local traffic - MAPIsham St is closed from Broadway to Seaman Ave.
Isham St is closed from Broadway to Seaman Ave.
Start Time: 2024-05-14T02:50:51.000-04:00
End Time: 2024-05-16T23:59:00.000-04:00
map directions local traffic - MAPPort Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed and detoured, Saturday May 18th, 2024 thru Sunday May 19th, 2024, 10:00 PM thru 12:00 PM All lanes closed and detoured
Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed and detoured, Saturday May 18th, 2024 thru Sunday May 19th, 2024, 10:00 PM thru 12:00 PM All lanes closed and detoured
Start Time: 2024-05-13T21:00:00.000-04:00
End Time: 2024-05-14T05:00:00.000-04:00
map directions local traffic - MAPPort Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed and detoured, Friday May 17th, 2024 thru Saturday May 18th, 2024, 11:00 PM thru 08:00 AM All lanes closed and detoured, Saturday May 18th, 2024 thru Sunday May 19th, 2024, 10:00 PM thru 12:00 PM All lanes closed and detoured
Port Authority NY/NJ: bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday May 13th, 2024 thru Friday May 17th, 2024, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed and detoured, Friday May 17th, 2024 thru Saturday May 18th, 2024, 11:00 PM thru 08:00 AM All lanes closed and detoured, Saturday May 18th, 2024 thru Sunday May 19th, 2024, 10:00 PM thru 12:00 PM All lanes closed and detoured
Start Time: 2024-05-13T21:00:00.000-04:00
End Time: 2024-05-14T06:39:04.733-04:00
map directions local traffic - MAPE 30th St is closed from Park Ave S to 3rd Ave.
E 30th St is closed from Park Ave S to 3rd Ave.
Start Time: 2024-05-13T20:46:31.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPBainbridge Ave is closed from E Mosholu Pkwy N to Mosholu Pkwy N.
Bainbridge Ave is closed from E Mosholu Pkwy N to Mosholu Pkwy N.
Start Time: 2024-05-13T08:57:10.000-04:00
End Time: 2024-05-15T23:59:00.000-04:00
map directions local traffic - MAPNYSDOT - Region 11: Construction, construction on ATLANTIC AVE eastbound between 134TH ST (New York) and VAN WYCK EXPY (New York) 1 Left lane of 3 lanes closed until 5:00 A.M.
NYSDOT - Region 11: Construction, construction on ATLANTIC AVE eastbound between 134TH ST (New York) and VAN WYCK EXPY (New York) 1 Left lane of 3 lanes closed until 5:00 A.M.
Start Time: 2024-05-10T21:36:30.000-04:00
End Time: 2024-05-14T06:39:04.734-04:00
map directions local traffic