Constructions near Junction at Solomon St
2024-05-28
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPThe road is closed near SE Center Street.
The road is closed near SE Center Street.
Start Time: 2024-04-29T06:00:00.000-04:00
End Time: 2024-05-28T18:00:00.000-04:00
map local traffic - MAPRoadwork on US-117 N / W Trade Rd from US-117 Alt/S 4th St (US-117) to I-40 Conn (US-117).
Roadwork on US-117 N / W Trade Rd from US-117 Alt/S 4th St (US-117) to I-40 Conn (US-117).
Start Time: 2024-05-27T16:17:00.000-04:00
End Time: 2024-05-28T08:13:01.074-04:00
map local traffic - MAPBridge Maintenance-Joist Repair 35.19457, -78.24419
Bridge Maintenance-Joist Repair 35.19457, -78.24419
Start Time: 2024-05-20T08:00:00.000-04:00
End Time: 2024-06-03T17:00:00.000-04:00
map local traffic - MAPBridge Maintenance-Joist Repair 35.19457, -78.24419
Bridge Maintenance-Joist Repair 35.19457, -78.24419
Start Time: 2024-05-20T08:00:00.000-04:00
End Time: 2024-06-03T17:00:00.000-04:00
map local traffic - MAPRoadwork on US-117 N / N US Highway 117 from NC-403/Main St (Center St/US-117) to US-117 Alt/S 4th St (US-117).
Roadwork on US-117 N / N US Highway 117 from NC-403/Main St (Center St/US-117) to US-117 Alt/S 4th St (US-117).
Start Time: 2024-05-01T09:56:04.000-04:00
End Time: 2024-05-28T08:13:01.074-04:00
map local traffic