Constructions near Junction at Jay Dr
2024-05-25
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork on Walnut St from Cherry St to Russ Ave.
Roadwork on Walnut St from Cherry St to Russ Ave.
Start Time: 2024-05-25T00:40:00.000-04:00
End Time: 2024-05-25T08:17:46.553-04:00
map local traffic - MAPWalnut St is closed from Russ Ave to Cherry St.
Walnut St is closed from Russ Ave to Cherry St.
Start Time: 2024-04-02T13:20:00.000-04:00
End Time: 2024-05-25T08:17:46.553-04:00
map local traffic - MAPThere will be lanes reduced between Boundary Street and Barber Boulevard as crews prepare for the demolition of the bridge over Richland Creek. Motorists are advised to use caution in the area and to watch for posted signs and emergency personnel working in the area.
There will be lanes reduced between Boundary Street and Barber Boulevard as crews prepare for the demolition of the bridge over Richland Creek. Motorists are advised to use caution in the area and to watch for posted signs and emergency personnel working in the area.
Start Time: 2024-03-11T06:00:00.000-04:00
End Time: 2025-04-15T17:00:00.000-04:00
map local traffic - MAPRoadwork on Walnut St from Russ Ave to Cherry St.
Roadwork on Walnut St from Russ Ave to Cherry St.
Start Time: 2024-05-24T13:02:52.000-04:00
End Time: 2024-05-25T08:17:46.553-04:00
map local traffic