know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Lake Oaks Rd

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both directions of I-40 have narrowed lanes and barrier walls closing both shoulders between Exit 301 (I-440) and Exit 312 (NC-42).
    Both directions of I-40 have narrowed lanes and barrier walls closing both shoulders between Exit 301 (I-440) and Exit 312 (NC-42).
    Start Time: 2018-12-11T10:02:00.000-05:00
    End Time: 2024-06-30T06:00:00.000-04:00
    maplocal traffic
  • MAP
    Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
    Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
    Start Time: 2024-04-01T18:17:50.000-04:00
    End Time: 2024-06-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
    Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
    Start Time: 2024-04-01T17:58:47.000-04:00
    End Time: 2024-06-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadway and Bridge Construction over White Oak Creek
    Roadway and Bridge Construction over White Oak Creek
    Start Time: 2023-09-07T12:00:00.000-04:00
    End Time: 2026-03-09T18:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadway and Bridge Construction over White Oak Creek
    Roadway and Bridge Construction over White Oak Creek
    Start Time: 2023-09-07T12:00:00.000-04:00
    End Time: 2026-03-09T18:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
    Roadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
    Start Time: 2024-04-03T13:58:03.000-04:00
    End Time: 2024-05-30T08:44:21.523-04:00
    maplocal traffic
  • MAP
    Roadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
    Roadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
    Start Time: 2024-04-03T12:57:40.000-04:00
    End Time: 2024-05-30T08:44:21.523-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US