know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Foxfire Trce

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    The N.C. Department of Transportation has temporarily closed the Rocky River Bridge on Chatham Church Road due to safety concerns from deterioration of steel components. The 104-year-old bridge will be closed indefinitely as the department determines potential transportation solutions for the structure. In recent years, NCDOT has reduced the posted weight limit from 11 tons to 5 tons to reduce the size of the vehicles crossing the bridge. NCDOT follows the National Bridge Inspections Standards and ensures each bridge is inspected at least every two years, including about 150 in Chatham County.
    The N.C. Department of Transportation has temporarily closed the Rocky River Bridge on Chatham Church Road due to safety concerns from deterioration of steel components. The 104-year-old bridge will be closed indefinitely as the department determines potential transportation solutions for the structure. In recent years, NCDOT has reduced the posted weight limit from 11 tons to 5 tons to reduce the size of the vehicles crossing the bridge. NCDOT follows the National Bridge Inspections Standards and ensures each bridge is inspected at least every two years, including about 150 in Chatham County.
    Start Time: 2024-05-17T10:26:00.000-04:00
    End Time: 2024-12-31T11:26:00.000-05:00
    maplocal traffic
  • MAP
    The N.C. Department of Transportation has temporarily closed the Rocky River Bridge on Chatham Church Road due to safety concerns from deterioration of steel components. The 104-year-old bridge will be closed indefinitely as the department determines potential transportation solutions for the structure. In recent years, NCDOT has reduced the posted weight limit from 11 tons to 5 tons to reduce the size of the vehicles crossing the bridge. NCDOT follows the National Bridge Inspections Standards and ensures each bridge is inspected at least every two years, including about 150 in Chatham County.
    The N.C. Department of Transportation has temporarily closed the Rocky River Bridge on Chatham Church Road due to safety concerns from deterioration of steel components. The 104-year-old bridge will be closed indefinitely as the department determines potential transportation solutions for the structure. In recent years, NCDOT has reduced the posted weight limit from 11 tons to 5 tons to reduce the size of the vehicles crossing the bridge. NCDOT follows the National Bridge Inspections Standards and ensures each bridge is inspected at least every two years, including about 150 in Chatham County.
    Start Time: 2024-05-17T10:26:00.000-04:00
    End Time: 2024-12-31T11:26:00.000-05:00
    maplocal traffic
  • MAP
     Old Graham Rd/ Old 87 (SR1520) in Chatham County is scheduled to be closed starting on April  15th, 2024 and reopen to traffic on October 12th, 2024. This closure is needed for bridge replacement and construction. Commuters and local traffic will need to plan for alternative routes during this time. 
     Old Graham Rd/ Old 87 (SR1520) in Chatham County is scheduled to be closed starting on April  15th, 2024 and reopen to traffic on October 12th, 2024. This closure is needed for bridge replacement and construction. Commuters and local traffic will need to plan for alternative routes during this time. 
    Start Time: 2024-04-15T06:55:00.000-04:00
    End Time: 2024-10-12T07:55:00.000-04:00
    maplocal traffic
  • MAP
     Old Graham Rd/ Old 87 (SR1520) in Chatham County is scheduled to be closed starting on April  15th, 2024 and reopen to traffic on October 12th, 2024. This closure is needed for bridge replacement and construction. Commuters and local traffic will need to plan for alternative routes during this time. 
     Old Graham Rd/ Old 87 (SR1520) in Chatham County is scheduled to be closed starting on April  15th, 2024 and reopen to traffic on October 12th, 2024. This closure is needed for bridge replacement and construction. Commuters and local traffic will need to plan for alternative routes during this time. 
    Start Time: 2024-04-15T06:55:00.000-04:00
    End Time: 2024-10-12T07:55:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US