Constructions near Exit 15 at Poole Road18
2024-05-24
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPW Cabarrus St is closed from S Boylan Ave (Cabarrus St) to US-70/US-401/Dawson St/McDowell St (Cabarrus St).
W Cabarrus St is closed from S Boylan Ave (Cabarrus St) to US-70/US-401/Dawson St/McDowell St (Cabarrus St).
Start Time: 2024-05-24T05:26:07.000-04:00
End Time: 2024-05-26T23:59:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth directions of I-40 have narrowed lanes and barrier walls closing both shoulders between Exit 301 (I-440) and Exit 312 (NC-42).
Both directions of I-40 have narrowed lanes and barrier walls closing both shoulders between Exit 301 (I-440) and Exit 312 (NC-42).
Start Time: 2018-12-11T10:02:00.000-05:00
End Time: 2024-06-30T06:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00