Constructions near Junction at Rosebrooks Dr
2024-05-27
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPRoadwork from W Jones St to Glenwood Ave.
Roadwork from W Jones St to Glenwood Ave.
Start Time: 2024-05-27T05:35:04.000-04:00
End Time: 2024-05-29T23:59:00.000-04:00
map local traffic - MAPRoadwork from Glenwood Ave to W Jones St.
Roadwork from Glenwood Ave to W Jones St.
Start Time: 2024-05-27T05:35:04.000-04:00
End Time: 2024-05-29T23:59:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPRoadwork from White Oak to Edinburgh South Dr.
Roadwork from White Oak to Edinburgh South Dr.
Start Time: 2024-05-22T00:00:00.000-04:00
End Time: 2024-05-29T23:59:59.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic