know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Vick Ave

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Millbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
    Millbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
    Start Time: 2024-05-28T12:23:40.000-04:00
    End Time: 2024-05-30T23:59:00.000-04:00
    maplocal traffic
  • MAP
    The ramp to I-440 East is closed at Hillsborough Street.
    The ramp to I-440 East is closed at Hillsborough Street.
    Start Time: 2024-05-28T23:59:00.000-04:00
    End Time: 2024-08-26T07:00:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Almaden Way is closed from Chaffin Way to Brisbane Woods Way.
    Almaden Way is closed from Chaffin Way to Brisbane Woods Way.
    Start Time: 2024-05-29T09:04:49.000-04:00
    End Time: 2024-05-31T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Almaden Way is closed from Brisbane Woods Way to Chaffin Way.
    Almaden Way is closed from Brisbane Woods Way to Chaffin Way.
    Start Time: 2024-05-29T09:04:49.000-04:00
    End Time: 2024-05-31T23:59:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2023-10-25T17:00:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2023-10-25T17:00:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed near NC 54(Hillsborough St)
    The road is closed near NC 54(Hillsborough St)
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-11-15T17:00:00.000-05:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on Legacy Oaks Dr from Bristoe Dr to Hodge Rd.
    Roadwork on Legacy Oaks Dr from Bristoe Dr to Hodge Rd.
    Start Time: 2024-05-29T16:25:46.000-04:00
    End Time: 2024-05-30T08:44:21.523-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US