Constructions near Junction at Norwood Rd rcn 2 ncn 1
2024-05-30
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPMillbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
Millbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
Start Time: 2024-05-28T12:23:40.000-04:00
End Time: 2024-05-30T23:59:00.000-04:00
map local traffic - MAPNightly bridge closure over Richland Creek between Forest Grove Way and Galaxy Dr (SR-4534). Bridge Preservation Work.
Nightly bridge closure over Richland Creek between Forest Grove Way and Galaxy Dr (SR-4534). Bridge Preservation Work.
Start Time: 2024-05-06T21:00:00.000-04:00
End Time: 2024-05-30T05:00:00.000-04:00
map local traffic - MAPUtility Relocations
Utility Relocations
Start Time: 2023-08-01T21:00:00.000-04:00
End Time: 2024-05-30T05:00:00.000-04:00
map local traffic - MAPUtility Relocations
Utility Relocations
Start Time: 2023-08-01T21:00:00.000-04:00
End Time: 2024-05-30T05:00:00.000-04:00
map local traffic - MAPRoadwork from Glenwood Ave exit [7B] to Glenwood Ave.
Roadwork from Glenwood Ave exit [7B] to Glenwood Ave.
Start Time: 2024-05-30T02:29:41.000-04:00
End Time: 2024-06-06T23:59:00.000-04:00
map local traffic - MAPRoadwork from I-440 W / Six Forks Rd to I-440 W.
Roadwork from I-440 W / Six Forks Rd to I-440 W.
Start Time: 2024-05-29T08:23:56.000-04:00
End Time: 2024-06-05T23:59:00.000-04:00
map local traffic - MAPThe ramp to I-40 East is closed.
The ramp to I-40 East is closed.
Start Time: 2024-05-29T02:49:20.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic