- MAPRoadwork from Shawnee Dr / Julia Dr to Trail Two.
Roadwork from Shawnee Dr / Julia Dr to Trail Two.
Start Time: 2024-05-28T04:32:46.000-04:00
End Time: 2024-06-04T23:59:00.000-04:00
map local traffic - MAPRoadwork from Trail Two to Shawnee Dr / Julia Dr.
Roadwork from Trail Two to Shawnee Dr / Julia Dr.
Start Time: 2024-05-28T04:32:46.000-04:00
End Time: 2024-06-04T23:59:00.000-04:00
map local traffic - MAPTemporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
Start Time: 2021-03-08T08:00:00.000-05:00
End Time: 2024-05-28T08:17:38.017-04:00
map local traffic - MAPTemporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
Start Time: 2021-03-08T08:00:00.000-05:00
End Time: 2024-05-28T08:17:38.017-04:00
map local traffic - MAPContractor will be replacing bridges over South Buffalo Creek on East Gate City Blvd. Traffic will be places in a single lane each direction with temporary crossovers. Detour will be provided for Cedar Park Rd left turn movement. Construction is scheduled to be completed spring of 2025
Contractor will be replacing bridges over South Buffalo Creek on East Gate City Blvd. Traffic will be places in a single lane each direction with temporary crossovers. Detour will be provided for Cedar Park Rd left turn movement. Construction is scheduled to be completed spring of 2025
Start Time: 2022-12-05T14:02:00.000-05:00
End Time: 2025-05-01T17:02:00.000-04:00