know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Konica Dr

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
    Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
    Start Time: 2021-03-08T08:00:00.000-05:00
    End Time: 2024-05-23T09:04:19.326-04:00
    maplocal traffic
  • MAP
    Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
    Temporary Road Closure on March 8, 2021 over the dam on Brookhaven Drive
    Start Time: 2021-03-08T08:00:00.000-05:00
    End Time: 2024-05-23T09:04:19.326-04:00
    maplocal traffic
  • MAP
    Contractor will be replacing bridges over South Buffalo Creek on East Gate City Blvd. Traffic will be places in a single lane each direction with temporary crossovers. Detour will be provided for Cedar Park Rd left turn movement. Construction is scheduled to be completed spring of 2025  
    Contractor will be replacing bridges over South Buffalo Creek on East Gate City Blvd. Traffic will be places in a single lane each direction with temporary crossovers. Detour will be provided for Cedar Park Rd left turn movement. Construction is scheduled to be completed spring of 2025  
    Start Time: 2022-12-05T14:02:00.000-05:00
    End Time: 2025-05-01T17:02:00.000-04:00
    maplocal traffic
  • MAP
    Road work will be taking place to replace a bridge that has out lived its lifespan. Over the course of the construction there will be a detour bridge constructed and traffic shifted to allow room for the construction of the permeant bridge. After the construction of the permeant bridge traffic will then be located back on the new bridge and the detour bridge will be removed.  
    Road work will be taking place to replace a bridge that has out lived its lifespan. Over the course of the construction there will be a detour bridge constructed and traffic shifted to allow room for the construction of the permeant bridge. After the construction of the permeant bridge traffic will then be located back on the new bridge and the detour bridge will be removed.  
    Start Time: 2022-07-18T09:00:00.000-04:00
    End Time: 2024-08-17T17:00:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US