Constructions near Junction at Red Bud St
2024-05-31
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPThe ramp to I-440 East is closed at Hillsborough Street.
The ramp to I-440 East is closed at Hillsborough Street.
Start Time: 2024-05-28T23:59:00.000-04:00
End Time: 2024-08-26T07:00:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPW Hargett St is closed from US-401/US-70/S Dawson St/S McDowell St to S Boylan Ave.
W Hargett St is closed from US-401/US-70/S Dawson St/S McDowell St to S Boylan Ave.
Start Time: 2024-05-30T22:33:00.000-04:00
End Time: 2024-06-06T23:59:00.000-04:00
map local traffic - MAPAlmaden Way is closed from Chaffin Way to Brisbane Woods Way.
Almaden Way is closed from Chaffin Way to Brisbane Woods Way.
Start Time: 2024-05-29T09:04:49.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPAlmaden Way is closed from Brisbane Woods Way to Chaffin Way.
Almaden Way is closed from Brisbane Woods Way to Chaffin Way.
Start Time: 2024-05-29T09:04:49.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPLeyland Cypress Ln is closed from Lawson Cypress Ln to Monterey Pine Dr.
Leyland Cypress Ln is closed from Lawson Cypress Ln to Monterey Pine Dr.
Start Time: 2024-05-28T04:55:55.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPMonterey Pine Dr is closed from S Judd Pkwy SW to Lawson Cypress Ln.
Monterey Pine Dr is closed from S Judd Pkwy SW to Lawson Cypress Ln.
Start Time: 2024-05-28T04:55:55.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPChanging Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Start Time: 2024-04-01T18:17:50.000-04:00
End Time: 2024-06-20T17:00:00.000-04:00
map local traffic - MAPChanging Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Start Time: 2024-04-01T17:58:47.000-04:00
End Time: 2024-06-20T17:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00
map local traffic - MAPRoadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
Roadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
Start Time: 2024-04-03T13:58:03.000-04:00
End Time: 2024-05-31T08:18:33.854-04:00
map local traffic - MAPRoadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
Roadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
Start Time: 2024-04-03T12:57:40.000-04:00
End Time: 2024-05-31T08:18:33.854-04:00