Constructions near Junction at West Trawick Road

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    The ramp is closed at Exit 14 (Falls Of Neuse Rd)
    The ramp is closed at Exit 14 (Falls Of Neuse Rd)
    Start Time: 2024-05-19T21:00:00.000-04:00
    End Time: 2024-05-20T05:00:00.000-04:00
    maplocal traffic
  • MAP
    Utility Relocations
    Utility Relocations
    Start Time: 2024-05-19T21:00:00.000-04:00
    End Time: 2024-05-20T05:00:00.000-04:00
    maplocal traffic
  • MAP
    Utility Relocations
    Utility Relocations
    Start Time: 2024-05-19T21:00:00.000-04:00
    End Time: 2024-05-20T05:00:00.000-04:00
    maplocal traffic
  • MAP
    Utility Relocations
    Utility Relocations
    Start Time: 2024-05-19T21:00:00.000-04:00
    End Time: 2024-05-20T05:00:00.000-04:00
    maplocal traffic
  • MAP
    Utility Relocations
    Utility Relocations
    Start Time: 2024-05-18T21:00:00.000-04:00
    End Time: 2024-05-20T05:00:00.000-04:00
    maplocal traffic
  • MAP
    W Davie St is closed from US-401/US-70/S Dawson St/S McDowell St to S Blount St (E Davie St).
    W Davie St is closed from US-401/US-70/S Dawson St/S McDowell St to S Blount St (E Davie St).
    Start Time: 2024-05-20T00:00:00.000-04:00
    End Time: 2024-05-22T23:59:59.000-04:00
    maplocal traffic
  • MAP
    Contractors will be performing roadway rehabilitation work between Exit 5 (Lake Boone Trail) and Exit 10 (Wake Forest Road). Workers will be working on the shoulder daily, Monday through Friday and conducting lane closures nightly, Sunday through Thursday. Motorists must use caution while driving through the area at all times and follow nightly on-scene traffic controls.
    Contractors will be performing roadway rehabilitation work between Exit 5 (Lake Boone Trail) and Exit 10 (Wake Forest Road). Workers will be working on the shoulder daily, Monday through Friday and conducting lane closures nightly, Sunday through Thursday. Motorists must use caution while driving through the area at all times and follow nightly on-scene traffic controls.
    Start Time: 2023-04-06T21:00:00.000-04:00
    End Time: 2024-08-30T06:00:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street).  This work is in place to widen I-440 to Six lanes and upgrade all interchanges.  Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
    Start Time: 2019-12-19T16:14:00.000-05:00
    End Time: 2024-10-31T04:58:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork from Old Buffaloe Rd to Capital Blvd.
    Roadwork from Old Buffaloe Rd to Capital Blvd.
    Start Time: 2024-05-15T07:40:27.000-04:00
    End Time: 2024-05-22T23:59:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2023-10-25T17:00:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2023-10-25T17:00:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    The road is closed near NC 54(Hillsborough St)
    The road is closed near NC 54(Hillsborough St)
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-11-15T17:00:00.000-05:00
    maplocal traffic
  • MAP
    The road is closed near NC 54(Hillsborough St)
    The road is closed near NC 54(Hillsborough St)
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-11-15T17:00:00.000-05:00
    maplocal traffic
  • MAP
    The road is closed at Blue Ridge Road.
    The road is closed at Blue Ridge Road.
    Start Time: 2022-10-25T08:14:00.000-04:00
    End Time: 2024-10-25T19:00:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me