Starting On 3/11/2024 Big Peak Creek Rd Will Be Closed To Replace Two Bridges. The First Bridge Replacement Will Occur At The Intersection Of Carson Woods Rd. After This Bridge Is Completed And Opened The Contractor Will Be Remobilizing To Another Structure Down The Road 0.5 Miles From Piney Point Drive. These Bridges Are Scheduled To Be Completed By 8/20/2025. Traffic
2024-06-12
Roadnow