Constructions near Junction at Kennedy Drive
2024-06-07
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPI-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
Start Time: 2024-04-15T10:00:00.000-04:00
End Time: 2025-10-25T19:00:00.000-04:00
map local traffic - MAPPioneer St is closed from Blair Rd to Ira Allen Dr.
Pioneer St is closed from Blair Rd to Ira Allen Dr.
Start Time: 2024-06-05T13:41:54.000-04:00
End Time: 2024-06-12T23:59:00.000-04:00
map local traffic - MAPPioneer St is closed from Pinecrest Dr to Blair Rd.
Pioneer St is closed from Pinecrest Dr to Blair Rd.
Start Time: 2024-06-05T13:41:54.000-04:00
End Time: 2024-06-12T23:59:00.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-06-07T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-06-07T23:59:59.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic