Constructions near Junction at River Blvd
2024-06-05
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-06-05T08:44:58.571-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 6/7 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-06-05T08:44:58.571-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-06-05T08:44:58.571-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-06-05T08:44:58.571-04:00
map local traffic