Constructions near Junction at Crow Ridge Rd
2024-06-03
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPNYSDOT TMC - Albany: bridge replacement on CR-65 both directions between Highbridge Road (Rotterdam) and McDonald Ave (Schenectady), Continuous Monday January 29th, 2024 12:00 AM thru Monday September 30th, 2024 11:59 PM All lanes closed
NYSDOT TMC - Albany: bridge replacement on CR-65 both directions between Highbridge Road (Rotterdam) and McDonald Ave (Schenectady), Continuous Monday January 29th, 2024 12:00 AM thru Monday September 30th, 2024 11:59 PM All lanes closed
Start Time: 2024-01-29T00:00:00.000-05:00
End Time: 2024-06-03T23:59:59.000-04:00
map local traffic