Constructions near Junction at Frankfort Ave
2024-06-03
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPMarquette St is closed from Saint Clair Ave to S Marginal Rd.
Marquette St is closed from Saint Clair Ave to S Marginal Rd.
Start Time: 2024-05-31T10:19:52.000-04:00
End Time: 2024-06-03T23:59:00.000-04:00
map local traffic - MAPE 107th St is closed at Chester Ave.
E 107th St is closed at Chester Ave.
Start Time: 2024-05-29T11:26:30.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPSR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
SR 10 over Rocky River in both directions. SR 10 (Lorain Ave.) over the Rocky River will be reduced to one lane in each direction beginning Monday, March 18, through mid-November.
Start Time: 2024-03-18T01:00:00.000-04:00
End Time: 2024-11-15T23:59:00.000-05:00
map local traffic - MAPRoadwork on E 140th St from Saint Clair Ave to I-90/OH-2/Waterloo Rd.
Roadwork on E 140th St from Saint Clair Ave to I-90/OH-2/Waterloo Rd.
Start Time: 2023-05-08T01:00:00.000-04:00
End Time: 2024-06-03T08:17:51.614-04:00
map local traffic - MAPE.140th St. between St. Clair Ave. and Aspenwall Ave. northbound. E.140th St. southbound between St. Clair Ave. and Aspenwall Ave. will be closed beginning on Monday, May 8, through November for resurfacing. Northbound traffic will remain open. •Detour for southbound traffic will utilize E. 152nd St.
E.140th St. between St. Clair Ave. and Aspenwall Ave. northbound. E.140th St. southbound between St. Clair Ave. and Aspenwall Ave. will be closed beginning on Monday, May 8, through November for resurfacing. Northbound traffic will remain open. •Detour for southbound traffic will utilize E. 152nd St.
Start Time: 2023-05-08T01:00:00.000-04:00
End Time: 2024-09-20T00:59:00.000-04:00
map local traffic