Constructions near Junction at Passer Rd
2024-06-05
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPS 3rd Ave is closed from Main St / N 3rd Ave to 5th St.
S 3rd Ave is closed from Main St / N 3rd Ave to 5th St.
Start Time: 2024-06-04T00:00:00.000-04:00
End Time: 2024-06-06T23:59:59.000-04:00
map local traffic - MAPFuller St is closed from 5th St to Main St / N 3rd Ave.
Fuller St is closed from 5th St to Main St / N 3rd Ave.
Start Time: 2024-06-04T00:00:00.000-04:00
End Time: 2024-06-06T23:59:59.000-04:00
map local traffic - MAPRoadwork on N Old Bethlehem Pike from Rosedale Rd (Old Bethlehem Pike) to PA-663/W Broad St/John Fries Hwy.
Roadwork on N Old Bethlehem Pike from Rosedale Rd (Old Bethlehem Pike) to PA-663/W Broad St/John Fries Hwy.
Start Time: 2024-05-14T06:39:30.000-04:00
End Time: 2024-06-05T08:43:29.455-04:00
map local traffic - MAPRoadwork on DALTON ST / BROADWAY / MAIN ST / EMMAUS AV westbound between ALLENBROOK DR, TWENTYSIXTH ST and TWENTYSIXTH ST. There is a lane restriction.
Roadwork on DALTON ST / BROADWAY / MAIN ST / EMMAUS AV westbound between ALLENBROOK DR, TWENTYSIXTH ST and TWENTYSIXTH ST. There is a lane restriction.
Start Time: 2024-04-08T10:39:00.000-04:00
End Time: 2024-06-05T08:43:29.455-04:00
map local traffic - MAPRoadwork at Airport Rd.
Roadwork at Airport Rd.
Start Time: 2024-06-04T00:00:00.000-04:00
End Time: 2024-06-11T23:59:59.000-04:00
map local traffic