Constructions near Junction at Mullen Rd
2024-06-06
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPDivision St is closed from S Bridge St / South St to Veterans Memorial Dr W.
Division St is closed from S Bridge St / South St to Veterans Memorial Dr W.
Start Time: 2024-06-05T06:05:06.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPDivision St is closed from Veterans Memorial Dr W to S Bridge St / South St.
Division St is closed from Veterans Memorial Dr W to S Bridge St / South St.
Start Time: 2024-06-05T06:05:06.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPN Auten Ave is closed from Union Ave to Hope St.
N Auten Ave is closed from Union Ave to Hope St.
Start Time: 2024-06-05T05:29:45.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPS Bridge St is closed from US-206 to US-22 (N Bridge St).
S Bridge St is closed from US-206 to US-22 (N Bridge St).
Start Time: 2024-06-04T16:05:52.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPN Bridge St is closed from US-22 to US-206 (S Bridge St).
N Bridge St is closed from US-22 to US-206 (S Bridge St).
Start Time: 2024-06-04T15:59:26.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPNJ DOT - STMC: Building fire on NJ 28 both directions West of Bridge St (Somerville) to Bridge St (Somerville) All lanes closed
NJ DOT - STMC: Building fire on NJ 28 both directions West of Bridge St (Somerville) to Bridge St (Somerville) All lanes closed
Start Time: 2024-06-04T15:07:16.000-04:00
End Time: 2024-06-07T23:59:00.000-04:00
map local traffic - MAPRoadwork on River Rd / County Hwy-567 from Amwell Rd (River Rd) to Pleasant Run Rd (S Branch Rd).
Roadwork on River Rd / County Hwy-567 from Amwell Rd (River Rd) to Pleasant Run Rd (S Branch Rd).
Start Time: 2024-05-30T18:39:30.000-04:00
End Time: 2024-06-05T08:43:29.455-04:00
map local traffic