Constructions near Junction at N Graham St
2024-05-30
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPMonroe Ave is closed from S Front St to N Riverside Dr.
Monroe Ave is closed from S Front St to N Riverside Dr.
Start Time: 2024-05-30T05:05:16.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPMonroe Ave is closed from N Riverside Dr to S Front St.
Monroe Ave is closed from N Riverside Dr to S Front St.
Start Time: 2024-05-30T05:05:16.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPMalco Crossing is closed from Malco Way to Riverdale Rd.
Malco Crossing is closed from Malco Way to Riverdale Rd.
Start Time: 2024-05-30T03:12:20.000-05:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPMalco Crossing is closed from Riverdale Rd to Malco Way.
Malco Crossing is closed from Riverdale Rd to Malco Way.
Start Time: 2024-05-30T03:12:20.000-05:00
End Time: 2024-06-01T23:59:00.000-05:00
map local traffic - MAPRoadwork on I-55 S from US-61 (I-55) to W McLemore Ave (I-55).
Roadwork on I-55 S from US-61 (I-55) to W McLemore Ave (I-55).
Start Time: 2024-05-29T19:27:00.000-05:00
End Time: 2024-05-30T07:50:13.687-05:00
map local traffic - MAPI-55 S / US-79 N / US-61 S / US-70 E / W Eh Crump Blvd is closed from Metal Museum Dr (I-55) to US-61 (I-55).
I-55 S / US-79 N / US-61 S / US-70 E / W Eh Crump Blvd is closed from Metal Museum Dr (I-55) to US-61 (I-55).
Start Time: 2024-03-10T20:00:00.000-05:00
End Time: 2024-05-30T07:50:13.687-05:00
map local traffic - MAPUS-79 N / US-61 S / US-70 E / W Eh Crump Blvd is closed at exit [12A].
US-79 N / US-61 S / US-70 E / W Eh Crump Blvd is closed at exit [12A].
Start Time: 2022-12-13T18:36:30.000-06:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPInterstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Interstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Start Time: 2022-05-03T00:36:00.000-05:00
End Time: 2025-02-25T00:00:00.000-06:00
map local traffic - MAPInterstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Interstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Start Time: 2022-05-03T00:36:00.000-05:00
End Time: 2025-02-25T00:00:00.000-06:00
map local traffic - MAPInterstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Interstate 55 both directions in Shelby County - Between EXIT 11: MCLEMORE AVE. / PRESIDENTS ISLAND and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.
Start Time: 2022-05-03T00:36:00.000-05:00
End Time: 2025-02-25T00:00:00.000-06:00
map local traffic - MAPRoadwork on Overton Crossing St from Frayser Blvd to Jan Dr.
Roadwork on Overton Crossing St from Frayser Blvd to Jan Dr.
Start Time: 2024-05-30T01:27:00.000-05:00
End Time: 2024-05-30T07:50:13.687-05:00
map local traffic - MAPStone St is closed from Wooddale Ave to Chuck Ave.
Stone St is closed from Wooddale Ave to Chuck Ave.
Start Time: 2024-05-29T11:56:24.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPStone St is closed from Chuck Ave to Wooddale Ave.
Stone St is closed from Chuck Ave to Wooddale Ave.
Start Time: 2024-05-29T11:56:24.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPMimosa Dr is closed from Howard Rd to Rosehaven St.
Mimosa Dr is closed from Howard Rd to Rosehaven St.
Start Time: 2024-05-28T04:55:30.000-05:00
End Time: 2024-05-30T23:59:00.000-05:00
map local traffic - MAPMimosa Dr is closed from Rosehaven St to Howard Rd.
Mimosa Dr is closed from Rosehaven St to Howard Rd.
Start Time: 2024-05-28T04:55:30.000-05:00
End Time: 2024-05-30T23:59:00.000-05:00
map local traffic - MAPDouglass Ave is closed from S Goodlett St to Watson St.
Douglass Ave is closed from S Goodlett St to Watson St.
Start Time: 2024-05-27T06:24:24.000-05:00
End Time: 2024-06-03T23:59:00.000-05:00
map local traffic - MAPMonroe Ave is closed from S Front St to S 2nd St.
Monroe Ave is closed from S Front St to S 2nd St.
Start Time: 2024-03-11T18:27:30.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPMonroe Ave is closed from S 2nd St to S Front St.
Monroe Ave is closed from S 2nd St to S Front St.
Start Time: 2024-03-11T17:27:23.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPState Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
Start Time: 2024-04-08T11:41:00.000-05:00
End Time: 2024-09-30T00:00:00.000-05:00
map local traffic - MAPState Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
Start Time: 2024-04-08T11:41:00.000-05:00
End Time: 2024-09-30T00:00:00.000-05:00
map local traffic - MAPState Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
Start Time: 2024-04-08T11:41:00.000-05:00
End Time: 2024-09-30T00:00:00.000-05:00
map local traffic - MAPState Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
Start Time: 2024-04-08T11:41:00.000-05:00
End Time: 2024-09-30T00:00:00.000-05:00
map local traffic - MAPState Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
State Route 23 both directions in Shelby County - Between SR-57 POPLAR AVE. and I-240, resurfacing work will result in lane closures every day. This work is expected to be completed by 09/30/2024.
Start Time: 2024-04-08T11:41:00.000-05:00
End Time: 2024-09-30T00:00:00.000-05:00
map local traffic