know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along TX-roads

Constructions near Junction at Blaney Avenue

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Roadwork from NE Loop 820 to Highway 121.
    Roadwork from NE Loop 820 to Highway 121.
    Start Time: 2024-05-30T23:29:18.000-05:00
    End Time: 2024-06-02T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
    Roadwork on I-820 E from Meadow Lakes Dr/Exit 20 (I-820) to Rufe Snow Dr/Exit 20 (I-820).
    Start Time: 2024-05-30T18:23:41.000-05:00
    End Time: 2024-05-31T06:04:05.648-05:00
    maplocal traffic
  • MAP
    Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to US-377/Denton Hwy/Exit 19 (I-820).
    Roadwork on I-820 E from Haltom Rd/Exit 18 (I-820) to US-377/Denton Hwy/Exit 19 (I-820).
    Start Time: 2024-05-30T12:45:00.000-05:00
    End Time: 2024-05-31T06:04:05.648-05:00
    maplocal traffic
  • MAP
    US-287 N Bus / Commerce St is closed from Lancaster Ave (US-287 Bus) to 7th St/6th St (US-287 Bus).
    US-287 N Bus / Commerce St is closed from Lancaster Ave (US-287 Bus) to 7th St/6th St (US-287 Bus).
    Start Time: 2024-05-30T08:26:13.000-05:00
    End Time: 2024-06-02T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Holiday Ln is closed at NE Loop 820.
    Holiday Ln is closed at NE Loop 820.
    Start Time: 2024-05-30T08:01:57.000-05:00
    End Time: 2024-06-01T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Main lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
    Main lanes closed. Night work only. SH 121 WB from SH 10 to Handley Ederville: 121 WB main lanes closed for stripping overhangs and pointing & patching.
    Start Time: 2024-05-24T02:00:00.000-05:00
    End Time: 2024-06-08T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Left lane closed. IH 820 NB from Randol Mill to Trinity Blvd: 820 NB left lane closure for installing OSS structures.
    Left lane closed. IH 820 NB from Randol Mill to Trinity Blvd: 820 NB left lane closure for installing OSS structures.
    Start Time: 2024-05-18T02:00:00.000-05:00
    End Time: 2024-06-08T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Grover Ave is closed from Dundee Ave to Deen Rd.
    Grover Ave is closed from Dundee Ave to Deen Rd.
    Start Time: 2024-05-30T12:25:22.000-05:00
    End Time: 2024-06-02T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Eunice St is closed from Sheri Ln to W Pipeline Rd.
    Eunice St is closed from Sheri Ln to W Pipeline Rd.
    Start Time: 2024-05-30T11:46:11.000-05:00
    End Time: 2024-06-02T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Ne Loop 820 is closed at The Boulders Apartments.
    Ne Loop 820 is closed at The Boulders Apartments.
    Start Time: 2024-05-29T08:55:07.000-05:00
    End Time: 2024-06-01T23:59:00.000-05:00
    maplocal traffic
  • MAP
    Left lane closed. Night work only. IH 820 NB from SH 10 Overpass to Pipeline/Glenview. 820 NB left lane for asphalt paving on the widening section.
    Left lane closed. Night work only. IH 820 NB from SH 10 Overpass to Pipeline/Glenview. 820 NB left lane for asphalt paving on the widening section.
    Start Time: 2024-05-29T02:00:00.000-05:00
    End Time: 2024-06-07T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Easterly Ave is closed at Westing Way.
    Easterly Ave is closed at Westing Way.
    Start Time: 2024-05-29T00:00:00.000-05:00
    End Time: 2024-05-31T23:59:59.000-05:00
    maplocal traffic
  • MAP
    Easterly Ave is closed at Westing Way.
    Easterly Ave is closed at Westing Way.
    Start Time: 2024-05-29T00:00:00.000-05:00
    End Time: 2024-05-31T23:59:59.000-05:00
    maplocal traffic
  • MAP
    Night work only. Right lane closed. SH 121 EB from Handley Ederville to SH 10 121 EB right lane closed for milling trucks to enter onto highway safely.
    Night work only. Right lane closed. SH 121 EB from Handley Ederville to SH 10 121 EB right lane closed for milling trucks to enter onto highway safely.
    Start Time: 2024-05-23T14:00:00.000-05:00
    End Time: 2024-06-08T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
    Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
    Start Time: 2024-05-29T02:00:00.000-05:00
    End Time: 2024-06-02T10:00:00.000-05:00
    maplocal traffic
  • MAP
    Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
    Lanes closed to traffic, detour in place. Watch for flag personnel directing traffic. Full Implementation of Detour Plan, Signed and Sealed on Sheet 22 as engineering safety control and protection of traffic during Phase 1 Step 4 Drainage System A 5x2 RCB installation. Detour will be implemented during night work at 9:00PM and will be return to Phase 1 Step 4 Traffic pattern by 5:00AM.
    Start Time: 2024-05-29T02:00:00.000-05:00
    End Time: 2024-06-02T10:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Start Time: 2024-05-28T14:00:00.000-05:00
    End Time: 2024-06-01T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Start Time: 2024-05-28T14:00:00.000-05:00
    End Time: 2024-06-01T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Start Time: 2024-05-28T14:00:00.000-05:00
    End Time: 2024-06-01T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Start Time: 2024-05-28T14:00:00.000-05:00
    End Time: 2024-06-01T20:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
    Roadwork on W Long Ave from US-287 Bus/N Main St (Long Ave) to Angle Ave (Long Ave).
    Start Time: 2024-05-22T12:38:30.000-05:00
    End Time: 2024-05-31T06:04:05.649-05:00
    maplocal traffic
  • MAP
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Delays due to slow moving road repair operations. Multiple lane closures. Watch for flag personnel directing traffic. Blue Mound Rd (156) from 287 to Watagua Dr (all travel directions): Traffic control to install permanent marking, block sodding, ramps, sidewalk and work on punch list items.
    Start Time: 2024-05-22T07:36:45.000-05:00
    End Time: 2024-07-10T23:55:00.000-05:00
    maplocal traffic
  • MAP
    Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
    Multiple lane closures. Night work only. IH 820 SB from Pipeline/Glenview to SH 10 multiple alternating lanes for level up and surface paving.
    Start Time: 2024-05-21T02:00:00.000-05:00
    End Time: 2024-05-31T11:00:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
    Roadwork on W Arkansas Ln from W Green Oaks Blvd to Little Rd.
    Start Time: 2024-05-14T10:15:00.000-05:00
    End Time: 2024-05-31T06:04:05.649-05:00
    maplocal traffic
  • MAP
    Roadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
    Roadwork on Airport Fwy from Wesley Way to Northeast Tarrant.
    Start Time: 2024-05-13T14:12:00.000-05:00
    End Time: 2024-05-31T06:04:05.649-05:00
    maplocal traffic
  • MAP
    Roadwork on North Fwy from Keller Hicks Rd to Josh Rd.
    Roadwork on North Fwy from Keller Hicks Rd to Josh Rd.
    Start Time: 2023-12-21T06:03:00.000-06:00
    End Time: 2024-06-24T14:34:00.000-05:00
    maplocal traffic
  • MAP
    Roadwork on North Fwy from Walker to Churchill Park Way.
    Roadwork on North Fwy from Walker to Churchill Park Way.
    Start Time: 2023-12-21T06:03:00.000-06:00
    End Time: 2024-06-24T14:34:00.000-05:00
    maplocal traffic
  • MAP
    Roadworks scheduled 31/05/2024 - 30/07/2024
    Roadworks scheduled 31/05/2024 - 30/07/2024
    Start Time: 2024-04-04T11:00:20.000-05:00
    End Time: 2024-07-29T20:00:16.000-05:00
    maplocal traffic
  • MAP
    Roadworks scheduled 31/05/2024 - 30/07/2024
    Roadworks scheduled 31/05/2024 - 30/07/2024
    Start Time: 2024-04-04T11:00:20.000-05:00
    End Time: 2024-07-29T20:00:16.000-05:00
    maplocal traffic
  • MAP
    Roadwork at Airport Fwy.
    Roadwork at Airport Fwy.
    Start Time: 2024-05-30T01:43:10.000-05:00
    End Time: 2024-06-01T23:59:00.000-05:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US