Constructions near Junction at Farr s Landing
2024-06-07
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPI-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
Start Time: 2024-04-15T06:00:00.000-04:00
End Time: 2025-10-25T19:00:00.000-04:00
map local traffic