Current Constructions
  • MAP
    S Williams St is closed from Main St to College St.
    S Williams St is closed from Main St to College St.
    Start Time: 2024-06-11T02:47:45.000-04:00
    End Time: 2024-06-13T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Pinecrest Dr to Button Dr.
    Pioneer St is closed from Pinecrest Dr to Button Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-14T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-14T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Colchester, US 2 & US 7 construction: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REALIGNMENT OF U.S. ROUTE 2 INCLUDING A NEW BRIDGE OVER INTERSTATE 89, REALIGNMENT OF INTERSTATE RAMPS AT EXIT 17, RESURFACING OF U.S. ROUTE 7 WITH THE ADDITION OF STRIPING, GUARDRAIL IMPROVEMENTS, SIGNAGE, BIKE CORRIDOR IMPROVEMENTS, AND OTHER HIGHWAY RELATED ITEMS.
    TRAFFIC ALERT: Colchester, US 2 & US 7 construction: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES THE REALIGNMENT OF U.S. ROUTE 2 INCLUDING A NEW BRIDGE OVER INTERSTATE 89, REALIGNMENT OF INTERSTATE RAMPS AT EXIT 17, RESURFACING OF U.S. ROUTE 7 WITH THE ADDITION OF STRIPING, GUARDRAIL IMPROVEMENTS, SIGNAGE, BIKE CORRIDOR IMPROVEMENTS, AND OTHER HIGHWAY RELATED ITEMS.
    Start Time: 2024-04-15T00:00:00.000-04:00
    End Time: 2024-06-14T23:59:59.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00