know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along VT-roads

Constructions near Junction at Florida Avenue

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    S Williams St is closed from Main St to College St.
    S Williams St is closed from Main St to College St.
    Start Time: 2024-06-11T02:47:45.000-04:00
    End Time: 2024-06-13T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Pinecrest Dr to Button Dr.
    Pioneer St is closed from Pinecrest Dr to Button Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-14T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-14T23:59:59.000-04:00
    maplocal traffic
  • MAP
    King St is closed from S Winooski Ave to Saint Paul St.
    King St is closed from S Winooski Ave to Saint Paul St.
    Start Time: 2024-04-22T12:17:00.000-04:00
    End Time: 2024-06-13T23:59:59.000-04:00
    maplocal traffic
  • MAP
    King St is closed from Saint Paul St to S Winooski Ave.
    King St is closed from Saint Paul St to S Winooski Ave.
    Start Time: 2024-04-22T11:45:00.000-04:00
    End Time: 2024-06-13T23:59:59.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US