    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2024-06-08T23:59:59.000-04:00