Constructions near Junction at Arrow Head Lake Rd
2024-06-12
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPTRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-06-14T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
TRAFFIC ALERT: Bridge Maintenance on US-7 Colchester about a mile north of the intersection of VT-2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. The roadway is open to one lane controlled with a temporary signal; 14-foot lane is maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-06-14T23:59:59.000-04:00
map local traffic