Constructions near Junction at Allen Rd
2024-05-20
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPMarket St is closed from Dorset St to Garden St.
Market St is closed from Dorset St to Garden St.
Start Time: 2024-05-20T03:23:49.000-04:00
End Time: 2024-05-22T23:59:00.000-04:00
map local traffic - MAPBank St is closed from S Winooski Ave to Center St.
Bank St is closed from S Winooski Ave to Center St.
Start Time: 2024-05-20T00:15:38.000-04:00
End Time: 2024-05-22T23:59:00.000-04:00
map local traffic - MAPI-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
Start Time: 2024-05-20T00:00:00.000-04:00
End Time: 2024-05-24T23:59:59.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic