Constructions near Junction at Lee St
2024-06-10
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPWV-251 / 10th st is closed from Virginia St / S Front St to Main St.
WV-251 / 10th st is closed from Virginia St / S Front St to Main St.
Start Time: 2021-11-04T22:51:30.000-04:00
End Time: 2024-06-10T06:40:25.139-04:00
map local traffic - MAPRoadwork on US-250 W / Cadiz Pike Rd from US-40/OH-7 (Cadiz Pike Rd/Lincoln Ave/US-250) to CR-14/Farmington Rd (Colerain Rd/US-250).
Roadwork on US-250 W / Cadiz Pike Rd from US-40/OH-7 (Cadiz Pike Rd/Lincoln Ave/US-250) to CR-14/Farmington Rd (Colerain Rd/US-250).
Start Time: 2024-05-23T08:44:00.000-04:00
End Time: 2024-06-10T06:40:25.139-04:00
map local traffic - MAPU.S. Route 250 Slide Repair northbound. Starting on May 20, a project to repair a slide along U.S. Route 250 will begin one mile east of the Bridgeport interchange of U.S. Route 250 and U.S. Route 40. The work will be conducted under a 10-foot width restriction. Temporary traffic signals will be used to maintain traffic during the construction.
U.S. Route 250 Slide Repair northbound. Starting on May 20, a project to repair a slide along U.S. Route 250 will begin one mile east of the Bridgeport interchange of U.S. Route 250 and U.S. Route 40. The work will be conducted under a 10-foot width restriction. Temporary traffic signals will be used to maintain traffic during the construction.
Start Time: 2024-05-20T01:00:00.000-04:00
End Time: 2024-11-01T00:59:00.000-04:00
map local traffic