Constructions near I 10 exit 600
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPAlves Ln is closed from Tripp Ln to Creekside Orch.
Alves Ln is closed from Tripp Ln to Creekside Orch.
Start Time: 2024-05-29T05:26:21.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPRoadwork from Oak Run Pkwy to Loop 337.
Roadwork from Oak Run Pkwy to Loop 337.
Start Time: 2024-05-29T03:39:01.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPThousand Oaks Dr is closed at San Antonio Northeast.
Thousand Oaks Dr is closed at San Antonio Northeast.
Start Time: 2024-05-29T02:50:25.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic - MAPRoadwork from Randolph Blvd exit [167A] to N Interstate 35.
Roadwork from Randolph Blvd exit [167A] to N Interstate 35.
Start Time: 2024-05-28T23:06:30.000-05:00
End Time: 2024-06-04T23:59:00.000-05:00
map local traffic - MAPRoadwork from Interstate 10 E to TX-130 S.
Roadwork from Interstate 10 E to TX-130 S.
Start Time: 2024-05-28T21:37:30.000-05:00
End Time: 2024-06-05T23:59:00.000-05:00
map local traffic - MAPRoadwork on I-10 E / US-90 E / TX-130 N from FM-1516/Exit 585 (I-10) to TX-1604 Loop/Exit 587 (I-10).
Roadwork on I-10 E / US-90 E / TX-130 N from FM-1516/Exit 585 (I-10) to TX-1604 Loop/Exit 587 (I-10).
Start Time: 2024-04-20T07:12:00.000-05:00
End Time: 2024-07-12T00:00:00.000-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeCrews will be constructing a 2-way continuous left turn lane with signs and pavement markings, along with new subgrade, flex base, asphaltic concrete paving and drainage improvements. There will be intermittent lane closures throughout the duration of the project. Please be mindful of equipment and workers in the roadway. All work is weather permitting. Put down phones and other distractions. Talk. Text Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeCrews will be constructing a 2-way continuous left turn lane with signs and pavement markings, along with new subgrade, flex base, asphaltic concrete paving and drainage improvements. There will be intermittent lane closures throughout the duration of the project. Please be mindful of equipment and workers in the roadway. All work is weather permitting. Put down phones and other distractions. Talk. Text Crash.
Start Time: 2023-11-13T16:47:00.000-06:00
End Time: 2024-11-29T23:00:00.000-06:00
map local traffic - MAPRoadwork on W Interstate 10 from S Santa Clara Rd to Weber-Hoese Ln.
Roadwork on W Interstate 10 from S Santa Clara Rd to Weber-Hoese Ln.
Start Time: 2024-05-29T00:17:30.000-05:00
End Time: 2024-05-29T07:55:42.614-05:00
map local traffic - MAPRoadwork on Lower Seguin Rd from Weir Rd to Mirecourt Way.
Roadwork on Lower Seguin Rd from Weir Rd to Mirecourt Way.
Start Time: 2024-05-27T20:13:00.000-05:00
End Time: 2024-05-29T07:55:42.614-05:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2024-01-23T20:42:00.000-06:00
End Time: 2028-01-31T23:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2024-01-23T20:42:00.000-06:00
End Time: 2028-01-31T23:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2024-01-23T20:42:00.000-06:00
End Time: 2028-01-31T23:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2024-01-23T20:42:00.000-06:00
End Time: 2028-01-31T23:00:00.000-06:00
map local traffic - MAPAlternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Alternating lanes closed. Motorists should expect delays. Use alternate routeWork on this project will consist of the expansion of roadway from 2 lanes to 4 lanes, with a raised median or continuous left turn lane, bike lanes and sidewalks. Please be aware of crews and equipment in the roadway. There will be alternating lane closures from time to time. Slow down in the work zone so everyone makes it home safely. Talk. Text. Crash.
Start Time: 2024-01-23T20:42:00.000-06:00
End Time: 2028-01-31T23:00:00.000-06:00
map local traffic - MAPRoadwork on Lower Seguin Rd from Mirecourt Way to Weir Rd.
Roadwork on Lower Seguin Rd from Mirecourt Way to Weir Rd.
Start Time: 2024-04-25T02:53:00.000-05:00
End Time: 2024-05-29T07:55:42.614-05:00
map local traffic - MAPRoadwork at N Interstate 35.
Roadwork at N Interstate 35.
Start Time: 2024-05-29T02:07:54.000-05:00
End Time: 2024-05-31T23:59:00.000-05:00
map local traffic