- MAPMillbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
Millbrook Green Dr is closed from E Millbrook Rd to Millbrook Manor Cir / Millbrook Village Pl.
Start Time: 2024-05-28T12:23:40.000-04:00
End Time: 2024-05-30T23:59:00.000-04:00
map local traffic - MAPSR 2329 (LIZARD LICK RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2320 (RILEY HILL RD) & SR 2320 (GLORY RD) FOR BRIDGE #186 TO BE REPLACED IN THE ZEBULON/WENDELL AREA.
SR 2329 (LIZARD LICK RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2320 (RILEY HILL RD) & SR 2320 (GLORY RD) FOR BRIDGE #186 TO BE REPLACED IN THE ZEBULON/WENDELL AREA.
Start Time: 2024-01-02T08:00:00.000-05:00
End Time: 2025-03-21T17:00:00.000-04:00
map local traffic - MAPSR 2320 (RILEY HILL RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2329 (LIZARD LICK RD) & HWY 96 FOR BRIDGE #180 TO BE REPLACED OVER THE LITTLE RIVER IN THE ZEBULON/WENDELL AREA.
SR 2320 (RILEY HILL RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2329 (LIZARD LICK RD) & HWY 96 FOR BRIDGE #180 TO BE REPLACED OVER THE LITTLE RIVER IN THE ZEBULON/WENDELL AREA.
Start Time: 2023-11-06T08:00:00.000-05:00
End Time: 2025-03-21T17:00:00.000-04:00
map local traffic - MAPThe ramp to I-440 East is closed at Hillsborough Street.
The ramp to I-440 East is closed at Hillsborough Street.
Start Time: 2024-05-28T23:59:00.000-04:00
End Time: 2024-08-26T07:00:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPBoth inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Both inside and outside shoulders are closed with barrier wall on I-440 between Exit 4 (Wade Ave) and Exit 1 (I-40) and on US-1 between Exit 1 (I-40) and Exit 101 (Walnut Street). This work is in place to widen I-440 to Six lanes and upgrade all interchanges. Occasional traffic shifts, ramp closures, and night time lane closures will also occur through the life of the project.
Start Time: 2019-12-19T16:14:00.000-05:00
End Time: 2024-10-31T04:58:00.000-04:00
map local traffic - MAPSR 1435 (Tripp Rd) is closed between mailbox 553 and mailbox 619 due to a crossline replacement.
SR 1435 (Tripp Rd) is closed between mailbox 553 and mailbox 619 due to a crossline replacement.
Start Time: 2024-05-28T07:12:00.000-04:00
End Time: 2024-05-31T15:30:00.000-04:00
map local traffic - MAPSR 1435 (Tripp Rd) is closed between mailbox 553 and mailbox 619 due to a crossline replacement.
SR 1435 (Tripp Rd) is closed between mailbox 553 and mailbox 619 due to a crossline replacement.
Start Time: 2024-05-28T07:12:00.000-04:00
End Time: 2024-05-31T15:30:00.000-04:00
map local traffic - MAPRiver Rd is closed from Christian Light Rd to Regal Crest Dr.
River Rd is closed from Christian Light Rd to Regal Crest Dr.
Start Time: 2024-05-28T04:59:56.000-04:00
End Time: 2024-05-30T23:59:00.000-04:00
map local traffic - MAPRiver Rd is closed from Regal Crest Dr to Christian Light Rd.
River Rd is closed from Regal Crest Dr to Christian Light Rd.
Start Time: 2024-05-28T04:59:56.000-04:00
End Time: 2024-05-30T23:59:00.000-04:00
map local traffic - MAPLeyland Cypress Ln is closed from Lawson Cypress Ln to Monterey Pine Dr.
Leyland Cypress Ln is closed from Lawson Cypress Ln to Monterey Pine Dr.
Start Time: 2024-05-28T04:55:55.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPMonterey Pine Dr is closed from S Judd Pkwy SW to Lawson Cypress Ln.
Monterey Pine Dr is closed from S Judd Pkwy SW to Lawson Cypress Ln.
Start Time: 2024-05-28T04:55:55.000-04:00
End Time: 2024-05-31T23:59:00.000-04:00
map local traffic - MAPWhitfield St is closed from Hodge Rd to Hinton St.
Whitfield St is closed from Hodge Rd to Hinton St.
Start Time: 2024-05-27T09:32:21.000-04:00
End Time: 2024-05-29T23:59:00.000-04:00
map local traffic - MAPRoadwork from Glenwood Ave to W Jones St.
Roadwork from Glenwood Ave to W Jones St.
Start Time: 2024-05-27T05:35:04.000-04:00
End Time: 2024-05-29T23:59:00.000-04:00
map local traffic - MAPRoadwork from W Jones St to Glenwood Ave.
Roadwork from W Jones St to Glenwood Ave.
Start Time: 2024-05-27T05:35:04.000-04:00
End Time: 2024-05-29T23:59:00.000-04:00
map local traffic - MAPRoadwork from White Oak to Edinburgh South Dr.
Roadwork from White Oak to Edinburgh South Dr.
Start Time: 2024-05-22T00:00:00.000-04:00
End Time: 2024-05-29T23:59:59.000-04:00
map local traffic - MAPChanging Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Start Time: 2024-04-01T18:17:50.000-04:00
End Time: 2024-06-20T17:00:00.000-04:00
map local traffic - MAPChanging Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Changing Elevation of Hilltop Rd to resolve site distance issues for driveway into development.
Start Time: 2024-04-01T17:58:47.000-04:00
End Time: 2024-06-20T17:00:00.000-04:00
map local traffic - MAPRemoving the existing bridge on Cover Bridge Rd and building a new bridge in its place.
Removing the existing bridge on Cover Bridge Rd and building a new bridge in its place.
Start Time: 2024-04-01T05:00:00.000-04:00
End Time: 2024-10-28T17:00:00.000-04:00
map local traffic - MAPRemoving the existing bridge on Cover Bridge Rd and building a new bridge in its place.
Removing the existing bridge on Cover Bridge Rd and building a new bridge in its place.
Start Time: 2024-04-01T05:00:00.000-04:00
End Time: 2024-10-28T17:00:00.000-04:00
map local traffic - MAPGeorge Perry Lee Rd will be closed to allow for Construction of the new grade and alignment.
George Perry Lee Rd will be closed to allow for Construction of the new grade and alignment.
Start Time: 2023-12-13T10:00:00.000-05:00
End Time: 2024-06-15T17:50:00.000-04:00
map local traffic - MAPGeorge Perry Lee Rd will be closed to allow for Construction of the new grade and alignment.
George Perry Lee Rd will be closed to allow for Construction of the new grade and alignment.
Start Time: 2023-12-13T10:00:00.000-05:00
End Time: 2024-06-15T17:50:00.000-04:00
map local traffic - MAPSR 2320 (RILEY HILL RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2329 (LIZARD LICK RD) & HWY 96 FOR BRIDGE #180 TO BE REPLACED OVER THE LITTLE RIVER IN THE ZEBULON/WENDELL AREA.
SR 2320 (RILEY HILL RD) WILL BE CLOSED TO THRU TRAFFIC BETWEEN SR 2329 (LIZARD LICK RD) & HWY 96 FOR BRIDGE #180 TO BE REPLACED OVER THE LITTLE RIVER IN THE ZEBULON/WENDELL AREA.
Start Time: 2023-11-06T08:00:00.000-05:00
End Time: 2025-03-21T17:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2023-10-25T17:00:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPRoad Closed from Ramp to Ramp for Demolition of existing bridge and construction of new bridge.
Road Closed from Ramp to Ramp for Demolition of existing bridge and construction of new bridge.
Start Time: 2023-08-20T17:13:33.000-04:00
End Time: 2024-08-20T17:00:00.000-04:00
map local traffic - MAPRoad Closed from Ramp to Ramp for Demolition of existing bridge and construction of new bridge.
Road Closed from Ramp to Ramp for Demolition of existing bridge and construction of new bridge.
Start Time: 2023-08-20T16:49:30.000-04:00
End Time: 2024-08-20T17:00:00.000-04:00
map local traffic - MAPTurnage Rd access with be permanently closed off from US 70 starting on August 17, 2023 due to the ongoing construction project on US 70. To access Turnage Rd, travelers will need to use Wilsons Mills Rd and take that road to Turnage Rd.
Turnage Rd access with be permanently closed off from US 70 starting on August 17, 2023 due to the ongoing construction project on US 70. To access Turnage Rd, travelers will need to use Wilsons Mills Rd and take that road to Turnage Rd.
Start Time: 2023-08-17T10:00:00.000-04:00
End Time: 2024-08-17T10:00:00.000-04:00
map local traffic - MAPRobin Hood Rd closed due to realignment and construction of a box culvert.
Robin Hood Rd closed due to realignment and construction of a box culvert.
Start Time: 2023-02-22T16:36:00.000-05:00
End Time: 2024-09-01T00:00:00.000-04:00
map local traffic - MAPAddie Webb Lane Closed at George Perry Lee
Addie Webb Lane Closed at George Perry Lee
Start Time: 2022-11-17T15:34:00.000-05:00
End Time: 2024-11-17T16:34:00.000-05:00
map local traffic - MAPAddie Webb Lane Closed at George Perry Lee
Addie Webb Lane Closed at George Perry Lee
Start Time: 2022-11-17T15:34:00.000-05:00
End Time: 2024-11-17T16:34:00.000-05:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPThe road is closed near NC 54(Hillsborough St)
The road is closed near NC 54(Hillsborough St)
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-11-15T17:00:00.000-05:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPThe road is closed at Blue Ridge Road.
The road is closed at Blue Ridge Road.
Start Time: 2022-10-25T08:14:00.000-04:00
End Time: 2024-10-25T19:00:00.000-04:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00
map local traffic - MAPRoadway and Bridge Construction over White Oak Creek
Roadway and Bridge Construction over White Oak Creek
Start Time: 2023-09-07T12:00:00.000-04:00
End Time: 2026-03-09T18:00:00.000-04:00
map local traffic - MAPOn August 7, 2023, the NCDOT Contractor will beginning the project located at the intersection of NC 42/NC 96. We will be upgrading the intersection from a All-Way Stop Intersection to a Roundabout Intersection. During the day, there will be lane closures installed with flaggers to direct traffic and there will be times when portion of the roadway is closed and a detour in place. During this project, there will be utility work, drainage work, culvert work, concrete and asphalt work.
On August 7, 2023, the NCDOT Contractor will beginning the project located at the intersection of NC 42/NC 96. We will be upgrading the intersection from a All-Way Stop Intersection to a Roundabout Intersection. During the day, there will be lane closures installed with flaggers to direct traffic and there will be times when portion of the roadway is closed and a detour in place. During this project, there will be utility work, drainage work, culvert work, concrete and asphalt work.
Start Time: 2023-08-07T08:00:00.000-04:00
End Time: 2024-06-01T17:00:00.000-04:00
map local traffic - MAPOn August 7, 2023, the NCDOT Contractor will beginning the project located at the intersection of NC 42/NC 96. We will be upgrading the intersection from a All-Way Stop Intersection to a Roundabout Intersection. During the day, there will be lane closures installed with flaggers to direct traffic and there will be times when portion of the roadway is closed and a detour in place. During this project, there will be utility work, drainage work, culvert work, concrete and asphalt work.
On August 7, 2023, the NCDOT Contractor will beginning the project located at the intersection of NC 42/NC 96. We will be upgrading the intersection from a All-Way Stop Intersection to a Roundabout Intersection. During the day, there will be lane closures installed with flaggers to direct traffic and there will be times when portion of the roadway is closed and a detour in place. During this project, there will be utility work, drainage work, culvert work, concrete and asphalt work.
Start Time: 2023-08-07T08:00:00.000-04:00
End Time: 2024-06-01T17:00:00.000-04:00
map local traffic - MAPRoadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
Roadwork on Glen Rd from NC Highway 42 W / Commerce Pkwy to Mast Dr.
Start Time: 2024-04-03T13:58:03.000-04:00
End Time: 2024-05-29T08:58:39.082-04:00
map local traffic - MAPRoadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
Roadwork on Glen Rd from Mast Dr to NC Highway 42 W / Commerce Pkwy.
Start Time: 2024-04-03T12:57:40.000-04:00
End Time: 2024-05-29T08:58:39.082-04:00