know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-89

Constructions near I 89 VT exit 14

      
       UPDATE NOW

click anywhere on map to find more Constructions

Click for Real Time Traffic
 
 

Current Constructions
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    Start Time: 2024-04-15T10:00:00.000-04:00
    End Time: 2025-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2025-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    NYSDOT TMC - Albany: Construction on NY 22 both directions between Whallons Bay Rd (Westport) and Tyrell St (Westport) All lanes closed until 5:00 PM on December 31,2024
    NYSDOT TMC - Albany: Construction on NY 22 both directions between Whallons Bay Rd (Westport) and Tyrell St (Westport) All lanes closed until 5:00 PM on December 31,2024
    Start Time: 2024-03-11T07:00:00.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    NYSDOT TMC - Albany: Construction on NY 22 both directions between Whallons Bay Rd (Westport) and Tyrell St (Westport) All lanes closed until 5:00 PM on December 31,2024
    NYSDOT TMC - Albany: Construction on NY 22 both directions between Whallons Bay Rd (Westport) and Tyrell St (Westport) All lanes closed until 5:00 PM on December 31,2024
    Start Time: 2024-03-11T07:00:00.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    Roadwork on NY-22 / NYS Route 22 from Jersey St (NY-22) to CR-10/Elizabethtown-Wadhams Rd (NY-22).
    Roadwork on NY-22 / NYS Route 22 from Jersey St (NY-22) to CR-10/Elizabethtown-Wadhams Rd (NY-22).
    Start Time: 2024-06-05T21:15:00.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Pinecrest Dr to Blair Rd.
    Pioneer St is closed from Pinecrest Dr to Blair Rd.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    S Champlain St is closed from King St to Main St.
    S Champlain St is closed from King St to Main St.
    Start Time: 2024-06-04T14:53:24.000-04:00
    End Time: 2024-06-06T23:59:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on NY-22 / NYS Route 22 from CR-10/Elizabethtown-Wadhams Rd (NY-22) to NY-22/Whallons Bay Rd (NY-22).
    Roadwork on NY-22 / NYS Route 22 from CR-10/Elizabethtown-Wadhams Rd (NY-22) to NY-22/Whallons Bay Rd (NY-22).
    Start Time: 2024-06-04T18:11:25.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    Roadwork on East Ave from Williston Rd to E Village Dr.
    Roadwork on East Ave from Williston Rd to E Village Dr.
    Start Time: 2024-06-04T10:09:00.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Start Time: 2024-05-25T05:51:30.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
  • MAP
    Roadwork on NY-22 / NYS Route 22 from Jersey St (NY-22) to NY-22/Whallons Bay Rd (NY-22).
    Roadwork on NY-22 / NYS Route 22 from Jersey St (NY-22) to NY-22/Whallons Bay Rd (NY-22).
    Start Time: 2024-03-13T07:29:04.000-04:00
    End Time: 2024-06-06T07:08:16.216-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US