know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along I-89

Constructions near I 89 VT exit 17

      
       UPDATE NOW

click anywhere on map to find more Constructions

Click for Real Time Traffic
 
 

Current Constructions
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
    Start Time: 2024-04-22T22:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    Start Time: 2024-04-15T10:00:00.000-04:00
    End Time: 2025-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    I-89 SB in Richmond approximately 1 mile south of Exit 11, SB barrel CLOSED for the bridge replacement project on US-2. SB travel utilizing crossover to NB barrel with one-lane open. 14-foot width restriction and 55 MPH speed restriction.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2025-10-25T19:00:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Pioneer St is closed from Blair Rd to Ira Allen Dr.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    Pioneer St is closed from Pinecrest Dr to Blair Rd.
    Pioneer St is closed from Pinecrest Dr to Blair Rd.
    Start Time: 2024-06-05T13:41:54.000-04:00
    End Time: 2024-06-12T23:59:00.000-04:00
    maplocal traffic
  • MAP
    S Champlain St is closed from King St to Main St.
    S Champlain St is closed from King St to Main St.
    Start Time: 2024-06-04T14:53:24.000-04:00
    End Time: 2024-06-06T23:59:00.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
    Start Time: 2024-05-27T00:00:00.000-04:00
    End Time: 2024-06-07T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2024-06-08T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2024-06-08T23:59:59.000-04:00
    maplocal traffic
  • MAP
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
    Start Time: 2024-04-15T06:00:00.000-04:00
    End Time: 2024-06-08T23:59:59.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
  • MAP
    Roadwork on East Ave from Williston Rd to E Village Dr.
    Roadwork on East Ave from Williston Rd to E Village Dr.
    Start Time: 2024-06-04T10:09:00.000-04:00
    End Time: 2024-06-06T08:19:47.371-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Roadwork on VT-108 / Mountain Rd from VT Route 108 S to Mansfield Base.
    Start Time: 2024-05-25T05:51:30.000-04:00
    End Time: 2024-06-06T08:19:47.371-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Vt Route 108 S from Morse Dr to Cambridge.
    Roadwork on VT-108 / Vt Route 108 S from Morse Dr to Cambridge.
    Start Time: 2024-05-15T07:53:08.000-04:00
    End Time: 2024-06-06T08:19:47.371-04:00
    maplocal traffic
  • MAP
    Roadwork on VT-108 / Mountain Rd from Mansfield Base to VT Route 108 S.
    Roadwork on VT-108 / Mountain Rd from Mansfield Base to VT Route 108 S.
    Start Time: 2024-05-14T19:52:00.000-04:00
    End Time: 2024-06-06T08:19:47.371-04:00
    maplocal traffic
  • MAP
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
    Start Time: 2024-04-11T19:00:00.000-04:00
    End Time: 2026-08-31T19:00:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US