- MAPI-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
Start Time: 2024-04-22T22:00:00.000-04:00
End Time: 2024-05-31T23:59:59.000-04:00
map local traffic - MAPI-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
I-89 NB between Milton (MM 102) and St. Albans Town (MM 113.4). Patching, pothole repair, milling, and paving activities. Lane closures during working hours. Nights: Sunday-Thursday 6:00PM-7:00AM. Days: Monday-Friday hours still to be determined.
Start Time: 2024-04-22T22:00:00.000-04:00
End Time: 2024-05-31T23:59:59.000-04:00
map local traffic - MAPRoadwork on VT-2A / Park st from US-2/Williston Rd (St George Rd/VT-2A) to VT-117/VT-15/Maple St/Pearl St (Park St/Lincoln St/VT-2A).
Roadwork on VT-2A / Park st from US-2/Williston Rd (St George Rd/VT-2A) to VT-117/VT-15/Maple St/Pearl St (Park St/Lincoln St/VT-2A).
Start Time: 2024-05-30T19:29:30.000-04:00
End Time: 2024-05-31T08:20:18.959-04:00
map local traffic - MAPS Champlain St is closed from King St to Main St.
S Champlain St is closed from King St to Main St.
Start Time: 2024-05-29T00:00:00.000-04:00
End Time: 2024-05-31T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-05-31T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
TRAFFIC ALERT: Bridge Maintenance on US 7 Colchester about a mile north of the intersection of VT 2A. Concrete repairs to the backwall/deck/t-beams and re-paving with associated approach work. A temporary traffic signal will be installed, and the roadway will be reduced to one-lane for the duration of the project. A 14-foot lane will be maintained.
Start Time: 2024-05-27T00:00:00.000-04:00
End Time: 2024-05-31T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
Start Time: 2024-04-15T06:00:00.000-04:00
End Time: 2024-06-01T23:59:59.000-04:00
map local traffic - MAPTRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
TRAFFIC ALERT: VT 15 Cambridge to Johnson paving project. From approx. the roundabout in Cambridge and easterly to just past Collins hill Rd. in Johnson. Resurfacing, new pavement markings, guardrails, drainage, and other related highway items.
Start Time: 2024-04-15T06:00:00.000-04:00
End Time: 2024-06-01T23:59:59.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic - MAPUS-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
US-2/US-7 (Main St) in Winooski from the New England Central Railroad bridge (near Maple St) to the Winooski/Colchester line, Main Street revitalization project. Single lane closures expected with southbound traffic diverted to Weaver St. Construction activities Monday-Friday 7:00 AM to 7:00 PM. Upgrades to water, sewer, and stormwater systems this season.
Start Time: 2024-04-11T19:00:00.000-04:00
End Time: 2026-08-31T19:00:00.000-04:00
map local traffic - MAPRoadwork on VT-108 / Vt Route 108 S from Morse Dr to Cambridge.
Roadwork on VT-108 / Vt Route 108 S from Morse Dr to Cambridge.
Start Time: 2024-05-15T07:53:08.000-04:00
End Time: 2024-05-31T08:20:18.959-04:00