Current Constructions
- MAPThe following road construction project is in progress: road construction with delays 10-15 minutes, intermitent closure, and reduced speed limit until 6:00 PM Sunday, June 2, 2024. Chip seal operation starting on 05/28 on I-90 from the 27th St. Interchange to the Lockwood Interchange. There will be intermittent lane closures both directions with a reduced speed limit. Possible delays up to 15 minutes.
The following road construction project is in progress: road construction with delays 10-15 minutes, intermitent closure, and reduced speed limit until 6:00 PM Sunday, June 2, 2024. Chip seal operation starting on 05/28 on I-90 from the 27th St. Interchange to the Lockwood Interchange. There will be intermittent lane closures both directions with a reduced speed limit. Possible delays up to 15 minutes.
Start Time: 2024-05-29T08:18:00.000-06:00
End Time: 2024-06-02T06:38:55.216-06:00
map local traffic - MAPThe following road construction project is in progress: road construction with reduced speed limit until further notice. Reduced speed limit due to road work on Coulson Road, from Johnson Lane to Coulson Road East, north east of Billings. Speed limit reduced to 35 mph. A new bridge will be constructed over the railroad tracks. Expect construction vehicles and workers in the area.
The following road construction project is in progress: road construction with reduced speed limit until further notice. Reduced speed limit due to road work on Coulson Road, from Johnson Lane to Coulson Road East, north east of Billings. Speed limit reduced to 35 mph. A new bridge will be constructed over the railroad tracks. Expect construction vehicles and workers in the area.
Start Time: 2024-03-18T11:24:30.000-06:00
End Time: 2024-06-02T06:38:55.216-06:00