Constructions near I 81 exit 217
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork on CHURCH HILL RD / DEAN RD both directions 0 miles SOUTH of TURNPIKE RD. There is a shoulder closed.
Roadwork on CHURCH HILL RD / DEAN RD both directions 0 miles SOUTH of TURNPIKE RD. There is a shoulder closed.
Start Time: 2024-02-07T07:17:00.000-05:00
End Time: 2024-05-15T19:40:59.658-04:00
map local traffic - MAPRoadwork on I-81 southbound between 1.4 miles south of Exit : REST AREA and .4 miles south of Exit 206: PA 374 - GLENWOOD/LENOXVILLE. There is a lane restriction.
Roadwork on I-81 southbound between 1.4 miles south of Exit : REST AREA and .4 miles south of Exit 206: PA 374 - GLENWOOD/LENOXVILLE. There is a lane restriction.
Start Time: 2024-04-16T10:25:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on PA 170 southbound between WHITE OAK DR and BEECH GROVE DR. All lanes closed.
Roadwork on PA 170 southbound between WHITE OAK DR and BEECH GROVE DR. All lanes closed.
Start Time: 2024-03-13T09:55:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on State Route 2024 / SR2024 from Hess Rd to Baker Rd / Carter Rd.
Roadwork on State Route 2024 / SR2024 from Hess Rd to Baker Rd / Carter Rd.
Start Time: 2024-05-07T09:17:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on Rock Lake Dr / SR4041 from Stockport Tpke to Rutledge Rd.
Roadwork on Rock Lake Dr / SR4041 from Stockport Tpke to Rutledge Rd.
Start Time: 2024-05-06T13:56:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on Rock Lake Dr / SR4041 from Daw Rd to Stockport Tpke.
Roadwork on Rock Lake Dr / SR4041 from Daw Rd to Stockport Tpke.
Start Time: 2024-05-06T08:56:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on DIMOCK RD / SR 2024 SH / MAIN ST / KINGSLEY RD eastbound between BAKER RD, CARTER RD and GREENWOOD RD. There is a lane restriction.
Roadwork on DIMOCK RD / SR 2024 SH / MAIN ST / KINGSLEY RD eastbound between BAKER RD, CARTER RD and GREENWOOD RD. There is a lane restriction.
Start Time: 2024-04-16T09:33:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Roadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Start Time: 2024-04-16T03:23:30.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Roadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Start Time: 2024-03-19T10:20:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic - MAPRoadwork on EQUINUNK CREEK RD northbound between MOODY RD and UPPER WOODS RD. There is a lane restriction.
Roadwork on EQUINUNK CREEK RD northbound between MOODY RD and UPPER WOODS RD. There is a lane restriction.
Start Time: 2022-08-03T17:08:00.000-04:00
End Time: 2024-05-15T19:42:29.347-04:00
map local traffic