Constructions near I 81 exit 230
Roadnow AI Agent Live Update
click anywhere on map to find more Constructions
Click for Real Time Traffic
Current Constructions
- MAPRoadwork on NY-17 W from Broome--Delaware County Border (NY-17) to NY-17/Exit 83 (NY-17).
Roadwork on NY-17 W from Broome--Delaware County Border (NY-17) to NY-17/Exit 83 (NY-17).
Start Time: 2024-05-11T18:20:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 17 [Delaware] both directions between Exit 84 - NY 17 (Exit 84) connector to NY 8/NY 10 (Deposit) and Exit 89 - Old State Highway; Ramp (Hancock) 1 left lane of 2 lanes blocked for guiderail repair to occur from 4/29 through 5/3 during the hours of 7:00 AM to 1:00 PM. This work is weather dependent with no flagger personnel present. Started open Reach. IR# 5143091
NYSDOT - Region 9: Roadwork on NY 17 [Delaware] both directions between Exit 84 - NY 17 (Exit 84) connector to NY 8/NY 10 (Deposit) and Exit 89 - Old State Highway; Ramp (Hancock) 1 left lane of 2 lanes blocked for guiderail repair to occur from 4/29 through 5/3 during the hours of 7:00 AM to 1:00 PM. This work is weather dependent with no flagger personnel present. Started open Reach. IR# 5143091
Start Time: 2024-04-29T09:22:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on NY-17 W from NY-26/Exit 67 (NY-17) to NY-434 Conn/Exit 65 (NY-17C/NY-17).
Roadwork on NY-17 W from NY-26/Exit 67 (NY-17) to NY-434 Conn/Exit 65 (NY-17C/NY-17).
Start Time: 2024-04-04T07:56:10.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Roadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Start Time: 2023-12-04T11:40:00.000-05:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Roadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Start Time: 2023-12-04T11:40:00.000-05:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Roadwork on I-81 southbound between .7 miles south of Exit : PENNSYLVANIA WELCOME CENTER/WEIGH STATION and .7 miles south of Exit 223: PA 492 - NEW MILFORD LAKESIDE. There is a traffic disruption.
Start Time: 2023-12-04T11:40:00.000-05:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on 990G both directions area of Exit - 990G; Connector from US 11 to I-81 (Exit 2) & NY 17 (Exit 75) (Kirkwood) 1 right lane of 2 lanes blocked for general bridge repairs to occur from 04/01 through 10/01 during the hours of 7:00AM and 5:00PM. The right lane will be blocked in each direction on SR 990G (EB/WB) with a temporary barrier in place maintaining traffic. Minimal lane width will be 12' in each direction. This work is not weather dependent. IR#5000091 D#265060
NYSDOT - Region 9: Roadwork on 990G both directions area of Exit - 990G; Connector from US 11 to I-81 (Exit 2) & NY 17 (Exit 75) (Kirkwood) 1 right lane of 2 lanes blocked for general bridge repairs to occur from 04/01 through 10/01 during the hours of 7:00AM and 5:00PM. The right lane will be blocked in each direction on SR 990G (EB/WB) with a temporary barrier in place maintaining traffic. Minimal lane width will be 12' in each direction. This work is not weather dependent. IR#5000091 D#265060
Start Time: 2024-04-01T09:11:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 5/17 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
NYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 5/17 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
Start Time: 2024-04-01T09:02:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 5/17 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
NYSDOT - Region 9: Roadwork on US 11 both directions between Exit 6 off ramp (Chenango) and Farrell Drive (Chenango) 1 alternate lanes of 2 lanes blocked for deck repairs, and paving to occur from 4/1 through 5/17 during the hours of 7:00 AM to 7:00 PM. This work is weather dependent with no flagger personnel present. All traffic controlled via temporary signal. Started Open Reach. IR# 4999091 D265118
Start Time: 2024-04-01T09:02:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on State Route 2024 / SR2024 from Hess Rd to Baker Rd / Carter Rd.
Roadwork on State Route 2024 / SR2024 from Hess Rd to Baker Rd / Carter Rd.
Start Time: 2024-05-08T17:05:02.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on PA-858 / Pennsylvania Ave from Bow Bridge Rd to Park Ln.
Roadwork on PA-858 / Pennsylvania Ave from Bow Bridge Rd to Park Ln.
Start Time: 2024-05-03T15:20:35.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on PA-858 / Pennsylvania Ave from Park Ln to Bow Bridge Rd.
Roadwork on PA-858 / Pennsylvania Ave from Park Ln to Bow Bridge Rd.
Start Time: 2024-05-03T14:20:30.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Roadwork on PA-267 / State Route 267 from PA-4014 (PA-267) to PA-706 (PA-267).
Start Time: 2024-04-16T17:43:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on DIMOCK RD / SR 2024 SH / MAIN ST / KINGSLEY RD eastbound between BAKER RD, CARTER RD and GREENWOOD RD. There is a lane restriction.
Roadwork on DIMOCK RD / SR 2024 SH / MAIN ST / KINGSLEY RD eastbound between BAKER RD, CARTER RD and GREENWOOD RD. There is a lane restriction.
Start Time: 2024-04-16T09:33:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
NYSDOT - Region 9: Roadwork on NY 7 both directions between Fallbrook Road (Conklin) and Millburn Drive (Conklin) 1 alternate lanes of 2 lanes blocked for bridge approach slab reconstruction and overlay from 4/15 through 5/24 during the hours of 6:30 AM to 3:00 PM. This work is weather dependent with no flagger personnel present. All traffic through site controlled via temporary signal. Started Open Reach. IR# 5051091 D264467
Start Time: 2024-04-15T10:01:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPRoadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Roadwork on PA 267 northbound between 1 miles SOUTH of STEWART RD and STEWART RD. There is a lane restriction.
Start Time: 2024-03-19T10:20:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic - MAPNYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
NYSDOT - Region 9: Roadwork on US 11 both directions between Rutherford Street (Binghamton) and Page Road (Kirkwood) 1 alternate lanes of 2 lanes blocked for drainage, curb and sidewalk replacement to occur from 5/6 through 11/17 during the hours of 7:00 AM to 5:00 PM. This work is weather dependent with no flagger personnel present. Starte3d Open Reach. IR# 5192091 D265195
Start Time: 2024-05-06T10:24:00.000-04:00
End Time: 2024-05-13T08:18:05.395-04:00
map local traffic