Constructions near Junction at Bare Creek Rd
2024-05-19
Roadnow
click anywhere on map to find more Constructions
Current Constructions
- MAPReplacing large culvert on NC 113 350' south of the US 221 intersection.
Replacing large culvert on NC 113 350' south of the US 221 intersection.
Start Time: 2024-04-29T08:00:00.000-04:00
End Time: 2024-07-26T17:00:00.000-04:00
map local traffic - MAPReplacing large culvert on NC 113 350' south of the US 221 intersection.
Replacing large culvert on NC 113 350' south of the US 221 intersection.
Start Time: 2024-04-29T08:00:00.000-04:00
End Time: 2024-07-26T17:00:00.000-04:00
map local traffic - MAPBridge replacement on Nettle Knob Road over South Beaver Creek.
Bridge replacement on Nettle Knob Road over South Beaver Creek.
Start Time: 2024-03-22T08:00:00.000-04:00
End Time: 2024-09-14T17:00:00.000-04:00
map local traffic - MAPBridge replacement on Nettle Knob Road over South Beaver Creek.
Bridge replacement on Nettle Knob Road over South Beaver Creek.
Start Time: 2024-03-22T08:00:00.000-04:00
End Time: 2024-09-14T17:00:00.000-04:00
map local traffic - MAPStarting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.
Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.
Start Time: 2024-03-11T08:00:00.000-04:00
End Time: 2025-08-20T17:00:00.000-04:00
map local traffic - MAPStarting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.
Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.
Start Time: 2024-03-11T08:00:00.000-04:00
End Time: 2025-08-20T17:00:00.000-04:00
map local traffic - MAPThe road will be closed North of SR-1613 (South Laurel Fork Road). Motorists are advised to follow the direction of on-scene personnel.
The road will be closed North of SR-1613 (South Laurel Fork Road). Motorists are advised to follow the direction of on-scene personnel.
Start Time: 2022-06-10T21:49:30.000-04:00
End Time: 2024-11-30T23:55:00.000-05:00
map local traffic - MAPts affecting traffic will be advertised separately outside of emergency work.
ts affecting traffic will be advertised separately outside of emergency work.
Start Time: 2022-02-23T09:00:00.000-05:00
End Time: 2025-05-17T16:00:00.000-04:00
map local traffic - MAPts affecting traffic will be advertised separately outside of emergency work.
ts affecting traffic will be advertised separately outside of emergency work.
Start Time: 2022-02-23T09:00:00.000-05:00
End Time: 2025-05-17T16:00:00.000-04:00
map local traffic