Constructions near Junction at James G Witherspoon Rd

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Start Time: 2024-04-29T08:00:00.000-04:00
    End Time: 2024-07-26T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Replacing large culvert on NC 113 350' south of the US 221 intersection.
    Start Time: 2024-04-29T08:00:00.000-04:00
    End Time: 2024-07-26T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Maintenance to bridge 428 - Road will be closed @ house # 2688 Jim Duvall Road, SR1528.
    Maintenance to bridge 428 - Road will be closed @ house # 2688 Jim Duvall Road, SR1528.
    Start Time: 2024-04-15T08:30:00.000-04:00
    End Time: 2024-05-24T18:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    ts affecting traffic will be advertised separately outside of emergency work.   
    ts affecting traffic will be advertised separately outside of emergency work.   
    Start Time: 2022-02-23T09:00:00.000-05:00
    End Time: 2025-05-17T16:00:00.000-04:00
    maplocal traffic
  • MAP
    ts affecting traffic will be advertised separately outside of emergency work.   
    ts affecting traffic will be advertised separately outside of emergency work.   
    Start Time: 2022-02-23T09:00:00.000-05:00
    End Time: 2025-05-17T16:00:00.000-04:00
    maplocal traffic