know it ahead ™ ...

>>> Get any help from a live AI Agent in real time along NC-roads

Constructions near Junction at Miller Hollow Rd

click anywhere on map to find more Constructions

 
 

Current Constructions
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Bridge replacement on Nettle Knob Road over South Beaver Creek. 
    Start Time: 2024-03-22T08:00:00.000-04:00
    End Time: 2024-09-14T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Starting on 3/11/2024 Big Peak Creek Rd will be closed to replace two bridges. The first bridge replacement will occur at the intersection of Carson Woods Rd. After this bridge is completed and opened the contractor will be remobilizing to another structure down the road 0.5 miles from Piney Point Drive. These bridges are scheduled to be completed by 8/20/2025.   
    Start Time: 2024-03-11T08:00:00.000-04:00
    End Time: 2025-08-20T17:00:00.000-04:00
    maplocal traffic
  • MAP
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Start Time: 2022-06-10T21:49:30.000-04:00
    End Time: 2025-06-01T13:33:00.000-04:00
    maplocal traffic
  • MAP
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Road closed to all activity for Laurel Fork Bridge Replacement. Detour in place from MP 248 (NC 18) to MP 258.7 (Northwest Trading Post).
    Start Time: 2022-06-10T21:49:30.000-04:00
    End Time: 2025-06-01T13:33:00.000-04:00
    maplocal traffic
  • MAP
    Single lane closures possible for road paving and infrastructure repairs. Access to Doughton Park, including the campground and Bluffs restaurant is available via NC 18.
    Single lane closures possible for road paving and infrastructure repairs. Access to Doughton Park, including the campground and Bluffs restaurant is available via NC 18.
    Start Time: 2024-05-20T14:01:00.000-04:00
    End Time: 2024-09-01T14:01:00.000-04:00
    maplocal traffic
See Also
Accidents near this location Accidents near me Constructions near me






Thank you for using Roadnow

Roadnow US